Skip to content
National Drought Management Authority · Open Data
National Drought Management Authority seal
KnowledgeWeb National Drought Management Authority
Help Center › Platform Documentation
Read online · users, administrators, ICT

Platform Documentation

The complete guide to KnowledgeWeb: overview, every module in depth, administration, business rules and the technical reference.

DOCUMENT CONTROL

About this document

ItemDetail
TitleKnowledgeWeb — Platform Documentation
SystemNDMA KnowledgeWebPro (KnowledgeWeb), .NET 10 Blazor Server platform
Version1.0 — prepared for Training & UAT, Machakos, 10–13 November 2026
OwnerNDMA ICT and Planning Department, with FABTECH Solutions Ltd
Production addresshttps://kms.fabtechcloud.com
AudienceAll users (Parts A–B), administrators (Part C), ICT and developers (Part D)
Companion documentsQuick User Manual (PDF) · User Overview deck (PowerPoint) · UAT Test Scripts & Scoresheet (Excel) · UAT Readiness Report

How this document is organised

  • Part A — Introduction — what KnowledgeWeb is, the core concepts and a glossary.
  • Part B — User guide — getting started, then one chapter per module with screens, procedures and rules.
  • Part C — Administration — setting up and running the platform: users, permissions, workflows, master data, monitoring.
  • Part D — Technical — requirements, installation, configuration, architecture, security, operations and troubleshooting.
  • Appendices — roles, the full permission catalogue, the page index and decisions pending.

Conventions

  • Menu paths are written Module > Page > Button, exactly as labelled on screen.
  • Permission keys appear in monospace, e.g. workplans.review-progress.
  • Screenshots come from the UAT environment and show synthetic test data.

Revision history

VersionDateChange
1.09 Nov 2026First complete edition for Training & UAT
Part A · Introduction

1Introducing KnowledgeWeb

KnowledgeWeb is the National Drought Management Authority's knowledge and performance platform. It replaces the legacy KMS (ASP.NET WebForms, two disconnected databases, 156 pages) with one secure, modern application where NDMA records its drought-response investments, publishes its knowledge, plans its work from the strategic plan down to each county, reports quarterly progress and analyses delivery — with a public portal that opens the record to citizens.

What changed from the legacy system

AreaLegacy KMSKnowledgeWeb
Technology.NET Framework 4.6.1 WebForms, DevExpress, Telerik.NET 10 Blazor Server, MudBlazor, one project
DataTwo databases (KMSLive, KMS-TestEnv), LINQ to SQLOne consolidated SQL Server database, EF Core
Sign-inSQL Membership, no 2FAASP.NET Core Identity, JWT, two-factor, passkeys, lockout
AccessRole flags on the staff recordFine-grained permissions with county/department scope
ApprovalsPer-module, hard-codedOne multi-level engine for every record type
PlanningSP_ and PME_ duplicate tablesStrategic plan → national → HQ/county cascade, quarterly progress review
InsightFusionCharts / DevExpress dashboardsLive dashboards, scorecards, PDF/Excel reports, scheduling
New—Training LMS, Knowledge AI, public open atlas, notifications, Excel round-trips

Core concepts

  • Permissions, not roles — Every capability is a permission (e.g. investments.publish) granted to a person, optionally limited to a county or department. Nothing is implied by a job title.
  • Placement — A person's county on their profile decides whether they are HQ staff (no county, or the county named HQ) or county staff (confined to that county).
  • Approval workflow — Investments, documents, plans and unlock requests go through configurable multi-level approval with full history.
  • Current strategic plan — One plan is marked current; work plans, progress and analytics work under it.
  • Lock — Submitting freezes a record for its approvers; final approval locks plans for good. Changes then need an approved unlock window.
  • Kenya fiscal year — 1 July – 30 June, written 2026/27; Q1 Jul–Sep, Q2 Oct–Dec, Q3 Jan–Mar, Q4 Apr–Jun.
  • Station — A reporting office: a county or an HQ department.

Glossary

TermMeaning
AIEAuthority to Incur Expenditure — final approver of activity requests
ASALArid and semi-arid lands; NDMA's 23 counties
CDCCounty Drought Coordinator
CascadeGenerating HQ and county work plans from the approved national plan (an upsert)
DRIPNDMA's investment-proposal system; proposals can be imported as investments
DRMDrought risk management
GoK / DonorGovernment of Kenya vs development-partner funding on a budget line
KRAKey Result Area in the strategic plan
SOStrategic Objective
SP TargetThe strategic plan's yearly target as carried on the national work plan
Unlock windowA time-limited editing period on an approved plan, granted by an approved unlock request
UATUser acceptance testing
Part B · User guide

2Getting started

Everything in this chapter applies to every user, whatever their permissions.

Sign in

  1. Open KnowledgeWeb in Chrome or Edge and click Staff sign in (or go straight to /auth/login).
  2. Enter your work email address and password, then click Sign In.
  3. If two-factor authentication is on, enter the 6-digit code from your authenticator app (or one recovery code).
  4. First sign-in with a temporary password? You are taken to Change Password and must set your own before anything else opens.
Sign in
Sign in

Find your way around

  1. The top bar holds the modules: Dashboard, Investments, Documents, Planning, Training, Approvals, Analytics, Reports, Knowledge AI and More (Admin, Data).
  2. Hover or click a module to open its sub-menu; the strip under the top bar shows the pages of the module you are in.
  3. You only see what your permissions allow. A page you cannot open shows Access refused instead of data.
  4. The bell shows new notifications; the moon icon switches dark mode; your initials open the profile menu.
Find your way around
Find your way around

Secure your account

  1. Profile menu > My Profile: update your position, phone and photo, then Save Changes.
  2. Profile menu > Two-Factor Auth: Enable, scan the QR code with an authenticator app, Verify & Enable, and keep the recovery codes somewhere safe.
  3. Profile menu > Passkeys: Add a passkey to sign in with Windows Hello, Touch ID or a security key.
  4. Profile menu > Notification preferences: choose email and in-app per notification type, and a daily or weekly digest. Each switch saves immediately.
Secure your account
Secure your account
  1. Approvals, returns, progress decisions, plan generation and announcements arrive in the bell and, if you allow it, by email.
  2. Every email button opens the exact page where you act, for example the plan review page for an approver.
  3. Notifications > Mark all read clears the badge; Preferences lets you switch individual types off.
Notifications and email links
Notifications and email links

When you are refused

A page you have no permission for shows Access refused with a link back to your dashboard, rather than an empty page. Ask your administrator for the permission named in the relevant chapter of this guide, then sign out and in again.

Access refused for a signed-in user without the permission
Access refused for a signed-in user without the permission
Part B · Investments

3Investments

At a glance
Investments

Record every drought-risk-management investment: what it is, where it runs, who funds and implements it, the results it promises, and how it is delivering. Approved investments are published to the public register and tracker.

Who uses it

WhoDoes what
County Officer / HQ Plannercapture and submit
Approversdecide
Publisherpublish
Everyone with view rightsbrowse, map, export

Key concepts

  • Category — Resilience, Response, Recovery or Other — the portfolio's top-level split, used as a filter and breakdown everywhere.
  • Micro or macro — Optional scale of the project, chosen on the form and offered as a filter on the public register and tracker. A record with no scale is in neither.
  • Identifiers — Code (issued by KnowledgeWeb, e.g. TUR-2026-0014, never reused), Serial no. (the source system's reference — mandatory and unique), Tender no. (the procurement reference, optional) and a share link for the public profile.
  • Results framework — Outputs → indicators (unit, baseline) → targets and achievements. Each indicator is reported Quarterly (per fiscal year, Q1–Q4) or for the Whole project (one target, one achievement). It drives the 'results progress' figure.
  • Partner investment — A project another stakeholder delivers. A record kind fixed at creation: reduced form, never submitted for approval, published straight from Draft, no results framework, attachments on the detail page.
  • Collaborator — A named colleague who may edit one investment and report its progress without holding investments.update.

How it flows

The screens

All Investments: status tabs, filters and the portfolio table
All Investments: status tabs, filters and the portfolio table
New Investment: start with the essentials; every other section unlocks once created
New Investment: start with the essentials; every other section unlocks once created
Investment detail with Report progress, PDF and Excel
Investment detail with Report progress, PDF and Excel
Map View of published investments
Map View of published investments

How to

Create an investment

  1. Investments > New Investment.
  2. Enter the project name, Serial no. (mandatory and unique), Tender no. if it went to tender, Category (Resilience, Response, Recovery or Other), Micro or macro (optional), project manager, funding agreement, budget and currency, start and end dates.
  3. Click Create investment. The other sections now unlock.
  4. Work through the sections on the left: Coverage (county, sub-county, ward, county funds), Sectors, Financing (fund sources and amounts), Results framework (outputs and indicators — each indicator reported Quarterly, or once for the Whole project), Implementers, Beneficiaries, Field sites (GPS), Keywords and Attachments.

Submit for approval

  1. On All Investments (or My Investments) click Submit for approval on the row.
  2. Choose the approval process, add a comment and submit.
  3. Track it under Approvals > My Submissions. Recall it there if no approver has acted yet; Resubmit after a return.

Record targets and achievements

  1. Results framework: add an output, then an indicator; choose Quarterly or Whole project in the indicator row.
  2. Quarterly: open the indicator's calendar, pick the fiscal year and enter a target and achievement for each of Q1–Q4. Whole project: enter one target and one achievement.
  3. Switching an existing indicator asks first: quarters are added into one whole-project figure; going back to quarterly clears that figure so it can be entered by quarter.

Report progress after approval

  1. Open the approved or published investment and click Report progress.
  2. Update funds absorption %, achievement status, the stalled flag, beneficiaries reached, indicator achievements and lessons learnt.
  3. Click Save progress. Targets, budgets and names cannot change once approved; documents and photos can still be added on the detail page.

Capture a partner investment

  1. Investments > Partner Investment for a project another stakeholder delivers.
  2. Complete Details, Coverage, Sectors, Financing, Implementers and Field sites, then save.
  3. Partner records skip internal approval: a publisher publishes them from the Registry once at least one county is set. Attach agreements and reports on the detail page.

Publish to the public portal

  1. Investments > Registry (HQ staff with investments.publish).
  2. Click Publish on an approved record (or a partner draft). It appears on the public register and tracker.
  3. Unpublish takes it off the portal again.

Other useful actions

  1. Collaborators (detail page): let a colleague edit this one record and report its progress without wider rights.
  2. Bulk import: download the template, fill it, Check the file, fix any rejected rows, then import. Choose 'Update existing where the serial matches' to update records.
  3. PDF and Excel on the detail page export the investment profile; Map View plots every published field site.

Rules and behaviour

  • Four identifiers: Code (system, e.g. TUR-2026-0014), Serial no. (from the source; mandatory and unique), Tender no. (procurement, optional) and a public share link. Search finds any of the first three.
  • County officers see their own county's investments, plus records they created or collaborate on.
  • An NDMA investment is frozen from submission: a return or recall puts it back to draft. After approval only Report progress, documents and photos stay open. Only drafts can be deleted.
  • A single funder's amount cannot exceed the total budget, and county allocations together cannot exceed it.
  • On the public portal an investment's status is its stage: Complete, In progress, Scheduled or Stalled.

Permissions used

Permission keyAllowsScopable
investments.viewView investmentsYes
investments.createCreate investmentsYes
investments.updateEdit investmentsYes
investments.manage-subresourcesManage counties/sectors/funders/outputs etc.Yes
investments.deleteDelete investments—
investments.publishPublish investments to the public portal—
Part B · Documents

4Resource Center

At a glance
Resource Center

Upload, classify, approve and publish NDMA's documents: drought early-warning bulletins, assessments, plans, policies and studies. Published items appear in the public Resource Library.

Who uses it

WhoDoes what
Any staff with upload rightsupload and submit
Approversdecide
Publisherpublish
Everyonebrowse, preview, download

Key concepts

  • Document type — Decides the approval route (via the type's classification in Admin > Document Routing).
  • Bulletin — Decided by the document type (a type whose name contains 'bulletin'). County bulletin = one county; national bulletin = no county. Year and month place it on the bulletin matrix; a county bulletin also carries its Early Warning phase classification.
  • PDF only — Only PDFs are published. An Office file is converted in the Convert to PDF wizard (check, convert, preview, keep); the original is kept for staff.
  • Download protection — A profile (licence, footer, watermark, licence page, copy/print/edit restrictions) applied to the public copy of a published PDF. Profiles are recommended per classification or type in Admin > Download Protection; the original file is never changed.
  • Bibliographic fields — Author, publication year and abstract feed the public library's facets and year axis.
  • Staff access — Grant colleagues View only or Contributor on one document.
  • Share link — A time-limited, download-capped link for someone outside NDMA; revocable.

How it flows

The screens

Upload a document: AI can read the file and fill the form
Upload a document: AI can read the file and fill the form
Resource centre: every document with status, type and quick preview
Resource centre: every document with status, type and quick preview
Document details with preview, download and external share links
Document details with preview, download and external share links
Document registry: publish approved documents to the portal
Document registry: publish approved documents to the portal

How to

Upload a document

  1. Documents > Upload & Submit (or Upload to keep a draft), then Choose file (PDF, Word, Excel, PowerPoint, images or ZIP, up to 50 MB). A file already in the library is refused, whatever it is called.
  2. With 'Read the file and fill this in' on, the AI suggests title, type, author, year and abstract; each filled field shows the quote it came from (Show me where). Switch it off to type everything yourself.
  3. Complete title, Document type (it decides the approval workflow), sector, author, publication year and description, then upload.
  4. Add Keywords and Staff access (View only or Contributor) on the next tabs.

File a drought bulletin

  1. Choose a bulletin document type (for example County Drought Bulletin or National Drought Bulletin): the bulletin panel opens with year and month, and county for a county bulletin.
  2. For a county bulletin record the Early Warning phase classification: the county's phase and trend and each livelihood zone's (AI can read the table from the PDF).
  3. HQ information officers file a month's county editions at once under Documents > Bulk County Bulletins: each county is read from its file name.
  4. Bulletins appear on the public bulletins matrix (counties × months) and the Early Warning board once published.

Submit, approve and publish

  1. Documents > My Documents > Submit for approval on the row (Upload & Submit does both at once).
  2. Approvers preview and approve under Approvals > Pending Approvals.
  3. Only PDFs are published. For a Word, Excel or PowerPoint file a publisher clicks Convert to PDF in the Registry: Check > Convert > Preview (page by page) > Keep. The original stays on the record for staff.
  4. A publisher opens Documents > Registry and clicks Publish. The dialog opens on the download-protection profile recommended for the document's type (licence, footer, watermark, copy/print restrictions): publish with it, pick another or adjust it. Unpublish withdraws it.

Share with someone outside NDMA

  1. Open the document > External share links.
  2. Set days until expiry, maximum downloads and (optionally) the recipient's email; Create link and copy it.
  3. Revoke the link at any time; it stops working immediately.

Find documents

  1. All Documents: status tiles, search and sort; the eye icon opens a side preview.
  2. Explorer: drill down classification > type > documents, with a breadcrumb to go back.
  3. Knowledge AI > Semantic Search finds documents by meaning, not just words.

Rules and behaviour

  • Only your own drafts can be edited; submitted documents need documents.update; published documents cannot be deleted.
  • Internal documents are approved like any other but never published. Download protection applies to the public copy only; the original file is never changed.
  • County staff see their own county's tagged documents and every untagged one.
  • Confirmed public subscribers receive a daily round-up of newly published items (double opt-in).

Permissions used

Permission keyAllowsScopable
documents.viewView documentsYes
documents.createUpload documentsYes
documents.updateEdit document metadataYes
documents.deleteDelete documents—
documents.publishPublish documents to the public portal—
documents.protection-settingsSet up download-protection profiles—
documents.manage-foldersManage document foldersYes
documents.manage-accessManage document sharing & accessYes
documents.manage-keywordsManage document keywordsYes
documents.manage-subscriptionsManage document-type subscriptionsYes
Part B · Approvals

5Approvals

At a glance
Approvals

One approval engine for investments, documents, strategic plans, national/HQ/county work plans and plan-unlock requests. Records move level by level; any approver named on the current level can act.

Who uses it

WhoDoes what
Submitterssubmit, recall, resubmit
Approversapprove, return, delegate
Tracking-report holdersmonitor turnaround

Key concepts

  • Approval process — A named chain of levels (1, 2, 3 …), global or county-specific. Each level lists one or more approvers; any of them can act.
  • Approval record — One submission travelling through a process: status, current level, submitter, history.
  • Decisions — Approve or Return (with a comment). There is no reject: a record that should not go ahead is returned with the reason.
  • Delegation — An approver can hand a record to a colleague; history shows who acted.
  • SLA reminders — Overdue records remind their approvers and escalate to super administrators.
  • E-signature — A process can require approvers to sign when approving.

How it flows

The screens

Pending Approvals: records awaiting your decision
Pending Approvals: records awaiting your decision
Plan review: read the whole plan, download Excel, then decide
Plan review: read the whole plan, download Excel, then decide
My Submissions: track, recall and resubmit
My Submissions: track, recall and resubmit

How to

Decide on a record

  1. Open Approvals > Pending Approvals (or click the button in the email).
  2. Click the eye icon to view details, or Review plan for a strategic or work plan.
  3. Approve (sign if the process requires an e-signature), or Return with a comment so the submitter can fix it. There is no Reject: a record that should not go ahead is returned with the reason.
  4. Tick several rows to approve them at once when appropriate.

Delegate while away

  1. On the record choose Delegate to a colleague and pick who.
  2. The delegate can act at your level; history records who acted.

Follow your submissions

  1. Approvals > My Submissions shows status and progress (level x of y).
  2. Recall withdraws a submission before any approver has acted.
  3. After a Return, edit the record and click Resubmit; it restarts at Level 1.

Monitor turnaround

  1. Approvals > Tracking Report: filter by record type and status, open a record, export to Excel.
  2. Overdue records trigger reminders to approvers and an escalation to administrators.

Rules and behaviour

  • Submitting a plan freezes it for everyone while approvers decide; a return or recall makes it editable again.
  • Final approval runs the module action: an investment or document becomes approved (publish-ready); a plan becomes locked.

Permissions used

Permission keyAllowsScopable
approvals.processes.viewView approval process configuration—
approvals.processes.manageConfigure approval processes/levels/approvers—
approvals.records.submitSubmit a record for approval—
approvals.records.view-tracking-reportView the approval tracking report—
Part B · Planning > Strategic Plans

6Strategic Planning

At a glance
Strategic Planning

Build the multi-year strategic plan as a hierarchy, from strategic issues down to performance indicators with yearly targets and budgets. The approved, current plan is the yardstick every work plan and progress figure is measured against.

Who uses it

WhoDoes what
HQ Plannerbuild, submit, reopen
Approversreview and approve
HQ staffread; county staff have no access

Key concepts

  • Hierarchy — Strategic Issue › Goal › Key Result Area › Outcome › Strategic Objective › Strategy › Key Activity › Expected Output › Performance Indicator.
  • Yearly targets — Each indicator's target per plan year. A year is 'planned' only where a target exists — a blank or dash means not planned.
  • Aggregation — Sum (default) or Last value for cumulative indicators; percentages are always read as last value.
  • Current plan — Exactly one plan is current; work plans and progress pages work under it.
  • Lock and unlock — Pending approval freezes the plan; final approval locks it for good. A plan unlock request, itself approved, opens a time-limited editing window.
  • SO Mappings — Which departments deliver which strategic objective — this decides what each HQ department sees in the HQ plan.
  • Progress roles — Per mapping: Primary (one per department per plan), Also submits, or View only. A department captures and submits HQ progress only for its primary and allowed objectives.

How it flows

The screens

Strategic Plans list with status, approval and quick actions
Strategic Plans list with status, approval and quick actions
Plan tree: Issue > Goal > KRA > Outcome > Objective > Strategy > Activity > Output > Indicator
Plan tree: Issue > Goal > KRA > Outcome > Objective > Strategy > Activity > Output > Indicator
SO Mappings: link each strategic objective to its departments
SO Mappings: link each strategic objective to its departments
Strategic Plan Scorecard: every indicator year by year
Strategic Plan Scorecard: every indicator year by year

How to

Create and build a plan

  1. Planning > Strategic Plans > New Plan: name, start and end year; save. Upload the signed plan document on the Documents tab.
  2. Open the Tree view and add the hierarchy: Add Issue, then Goal, Key Result Area, Outcome, Strategic Objective, Strategy, Activity, Output and Indicator.
  3. Open an indicator to set its baseline, whether it is a Percentage indicator, and Aggregation (Sum, or Last value for cumulative indicators), then enter yearly targets and budgets in its side panel. Planning has no unit of measure.
  4. For bulk work use Matrix (paste, fill down, Save All) or Import from Excel (Template > Upload > Validate > Commit).

Map objectives and make it current

  1. SO Mappings: tick the departments that deliver each strategic objective (each tick saves). A department's first objective becomes its primary.
  2. Progress submission (same page): for each department choose its primary objective and tick under Also submits any other objective it may submit. The rest are view only (★ primary · ✓ also submits · ○ view only).
  3. More > Set as current. Work plans and progress pages work under the current plan.

Approve, lock and revise

  1. More > Submit for approval and choose the process. The plan is read-only while it is pending.
  2. Final approval locks the plan permanently.
  3. To change a locked plan, Request to reopen: an approved, time-limited editing window.

Rules and behaviour

  • There is no unlock button: approval is the lock, and reopening needs its own approval.
  • Strategic plans and national/HQ plans are for HQ staff only.
  • There is no cloning: each strategic plan is drawn up new.
  • Changing SO mappings and progress roles needs strategicplanning.update; they stay editable on an approved plan.

Permissions used

Permission keyAllowsScopable
strategicplanning.viewView strategic plans—
strategicplanning.createCreate strategic plans—
strategicplanning.updateEdit strategic plans—
strategicplanning.manage-lifecycleLock/import/auto-number plans—
strategicplanning.deleteDelete strategic plans—
strategicplanning.request-unlockRequest reopening of a locked plan—
Part B · Planning > Work Plans

7Work Plans

At a glance
Work Plans

Turn the strategic plan into the year's national work plan, then cascade it to one HQ plan and a plan for each county. Each tier sets quarterly targets, budgets (GoK and donor), budget lines and responsible offices.

Who uses it

WhoDoes what
HQ Plannernational plan and cascade
HQ departmentstheir objectives in the HQ plan
County officerstheir county plan
Approversapprove each tier

Key concepts

  • Tiers — One national plan per fiscal year, one HQ plan and one plan per county, all derived from the national plan.
  • SP Target — The national plan's annual target, taken from the strategic plan's yearly target and never edited on the work plan.
  • Budget line rows — Each indicator carries one or more funding rows (*IndicatorFundSource): budget line, office, GoK and donor amounts, Q1–Q4 targets and plan notes.
  • Cascade — An upsert from national to HQ / counties. It updates what changed, keeps entered figures, and reports rows that no longer qualify instead of deleting them.
  • Local wording — HQ/county may rephrase an activity; outputs and indicators keep the national wording, and analytics group by the national text.
  • Who changes a county plan — Only staff placed in that county. HQ staff and administrators read it.
  • Indicator notes — Append-only commentary per indicator; read-only while the plan awaits approval and once it is approved (an unlock window reopens them).
  • Budget notes — On the national plan, one note per budget line on how its money is spent; shown read-only on the matching HQ and county lines.

How it flows

The screens

National Work Plan with Cascade to HQ and Cascade to counties
National Work Plan with Cascade to HQ and Cascade to counties
Cascade to counties: choose counties, review, done
Cascade to counties: choose counties, review, done
County work plan grouped by strategic objective
County work plan grouped by strategic objective
HQ plan: a department sees only the objectives mapped to it
HQ plan: a department sees only the objectives mapped to it

How to

Create and populate the national plan

  1. Planning > Work Plans > National > New work plan; choose the fiscal year (the current strategic plan is filled in); Create.
  2. Run the populate wizard: Scope > Select activities and indicators > Review > Done. The SP Target comes from the strategic plan and cannot be edited here.
  3. Edit (Grid): enter Q1–Q4 targets, GoK and donor amounts, budget line and office; Save All. Or use Edit in Excel to download, edit offline, upload and review every change before saving.

Approve and cascade

  1. Submit for approval; the approvers review the plan on its review page and approve.
  2. Once approved, Cascade to HQ (Review > Confirm > Done) and Cascade to counties (select counties > Review > Done).
  3. Re-running a cascade updates what changed and never overwrites figures that were already entered.

Complete an HQ or county plan

  1. Open your plan from Work Plans > HQ or County. The county list opens on the current fiscal year (Fiscal year filter; clear it for every year); county staff see only their own county.
  2. Enter quarterly targets and the annual target in Edit (Grid) or with Edit in Excel. National plan opens the parent plan for reference.
  3. Use the rephrase icon to put an activity in local wording without breaking the link to the national row. A county can also remove or add indicators from this year's national plan.
  4. Submit for approval. An approved plan is locked; progress is then reported under Progress Reporting.

Reopen a locked plan

  1. On the lock banner click Request to reopen: give the reason, choose the approval process and the window in days.
  2. When approved, edit what is needed, then click Finish & re-lock.
  3. Planning > Work Plans > Unlock Requests lists every request with a change report of what was touched.

Rules and behaviour

  • Only staff placed in a county change its plan. HQ staff and administrators open county plans view only.
  • Indicator notes follow the plan's lock: read-only while it awaits approval and once approved. The national plan's Budget notes explain how each budget line's money is spent and show read-only at HQ and county.
  • Budget lines on the national plan come from Master Data > Budget Lines; a line carried over from last year is marked Balance b/f.
  • Excel uploads are all or nothing: text in a number cell, a changed SP target or a file older than the latest edit is refused.

Permissions used

Permission keyAllowsScopable
workplans.viewView national/HQ/county work plansYes
workplans.createCreate work plansYes
workplans.updateEdit work plans, activities & indicatorsYes
workplans.manage-lifecycleSubmit/approve/generate HQ & county plansYes
workplans.submit-progressSubmit quarterly progressYes
workplans.review-progressReview submitted progressYes
workplans.submit-feedbackSubmit quarterly feedbackYes
workplans.deleteDelete national work plans—
workplans.request-unlockRequest reopening of a locked work planYes
workplans.progress-insightsView progress insights & reportsYes
Part B · Planning > Progress Reporting

8Progress Reporting

At a glance
Progress Reporting

Each quarter, HQ departments and counties record what was achieved against their approved plan, attach evidence and submit it. HQ reviewers accept it or return it with reasons; accepted figures feed every dashboard and report.

Who uses it

WhoDoes what
HQ departments and countiescapture and submit
Progress reviewers (HQ)accept or return
Analystsanalyse

Key concepts

  • Scope of a submission — HQ submits per strategic objective (only the departments with that objective as primary or allowed); a county submits its whole plan, per quarter, with three required documents.
  • Deadline — The 5th of the month after the quarter. After it, a first submission needs a late-submission request granted by a reviewer.
  • States — Not submitted → Submitted → Accepted, or Returned (with reasons and row flags) → Resubmitted.
  • Two kinds of comment — Plan notes (set while planning) and progress comments (written with each achievement). Reviewers see both.
  • Evidence — Supporting documents attached to a submission, fixed while it is submitted.
  • Station — A reporting office — a county or an HQ department.

The reporting calendar

QuarterMonthsProgress due
Q1July – September5 October
Q2October – December5 January
Q3January – March5 April
Q4April – June5 July

The screens

Progress hub: your plan with four quarter tiles
Progress hub: your plan with four quarter tiles
Capture one quarter: target beside achievement, % of target, comment
Capture one quarter: target beside achievement, % of target, comment
Review queue: oldest first, overdue highlighted
Review queue: oldest first, overdue highlighted
Review a submission: figures, comments, evidence, history, then Accept or Return
Review a submission: figures, comments, evidence, history, then Accept or Return

How to

Capture a quarter

  1. Planning > Progress Reporting > Capture Progress; on your plan card click Report Q#.
  2. For each indicator enter the achievement and a comment. Percentages must be 0–100 and nothing may be negative. A line with a target for the quarter, or an achievement different from its target, needs a progress comment.
  3. HQ: you capture only your department's primary objective and those it is allowed to submit; others show as view only.
  4. Save. You are warned before leaving with unsaved edits.

Submit for review

  1. Click Submit Q#. HQ submits per strategic objective; a county submits the whole plan.
  2. Add a covering note and attach supporting documents. A county submission needs three: the partnership template, the investment template and the CCU minutes.
  3. Confirm. At least one indicator needs a value; the rest are submitted as not reported. The quarter is frozen once submitted.

Review a submission (HQ reviewers)

  1. Progress Reporting > Review Queue; open the submission.
  2. Read figures against targets, the submitter's comments, plan notes, evidence and history.
  3. Accept, or Return with a reason and flag the rows that need attention. Tick 'Open the next submission afterwards' to keep going.

Fix a returned quarter

  1. Open the capture page; filter 'Flagged by reviewer' to see the flagged rows and the reason.
  2. Correct the figures and Resubmit. Flags resolve automatically.

Rules and behaviour

  • Only approved plans and quarters that have started can be captured. Kenya fiscal year: Q1 Jul–Sep, Q2 Oct–Dec, Q3 Jan–Mar, Q4 Apr–Jun.
  • Progress is due on the 5th of the month after the quarter ends. Daily reminders run from 3 days before the quarter ends to the 5th; after the 5th a first submission needs a late-submission request, granted by a reviewer.
  • Reviewing is for HQ staff with workplans.review-progress; county staff report their own progress only.

Permissions used

Permission keyAllowsScopable
workplans.viewView national/HQ/county work plansYes
workplans.createCreate work plansYes
workplans.updateEdit work plans, activities & indicatorsYes
workplans.manage-lifecycleSubmit/approve/generate HQ & county plansYes
workplans.submit-progressSubmit quarterly progressYes
workplans.review-progressReview submitted progressYes
workplans.submit-feedbackSubmit quarterly feedbackYes
workplans.deleteDelete national work plans—
workplans.request-unlockRequest reopening of a locked work planYes
workplans.progress-insightsView progress insights & reportsYes
Part B · Training

9Training (LMS)

At a glance
Training (LMS)

A built-in learning management system: courses with modules and materials, assessments, assignments with due dates, certificates with a public verification check, and feedback.

Who uses it

WhoDoes what
Trainersbuild, publish, assign, analyse
All stafflearn, take quizzes, earn certificates
Anyoneverify a certificate

Key concepts

  • Course — Category, level, minutes, CPD points, enrolment mode (open or assigned), certificate on completion.
  • Materials — Rich text, files (optionally downloadable), video URLs and links; each can be required for completion.
  • Assessment — Pass mark, gating, retake wait; questions written by hand or drafted by AI and approved by the trainer.
  • Certificate — Issued on completion, downloadable as PDF and verifiable publicly by its number.

The screens

Catalogue: search, filter and enrol
Catalogue: search, filter and enrol
Course player: materials, progress and bookmarks
Course player: materials, progress and bookmarks
Course builder: curriculum, assessment, enrolments, feedback
Course builder: curriculum, assessment, enrolments, feedback
My Learning: courses in progress and completed
My Learning: courses in progress and completed

How to

Take a course

  1. Training > Catalogue: search or filter, open Details, click Enroll.
  2. In the player open each material and click Mark complete, then Next. Bookmark anything to come back to.
  3. Take the assessment when offered. If you fail, wait the stated time and retake.
  4. Training > My Certificates > Download PDF once complete. Leave feedback on the course page.

Build and publish a course (trainers)

  1. Training > Manage > Courses > New Course: title, summary, category, level, minutes, CPD points, enrolment, certificate.
  2. Curriculum > Add Module, then + Material: rich text, file, video URL or link; mark what is required.
  3. Assessment: set the pass mark and retake wait, add questions (or Draft with AI, then approve the verified ones) and switch it on.
  4. Publish, then Enrollments > Assign Learners with a due date.

Rules and behaviour

  • A course can be published only with content; it can be deleted only while it is a draft with no enrolments.
  • Certificates can be verified on the public site at /public/verify-certificate.

Permissions used

Permission keyAllowsScopable
training.manageManage training content—
Part B · Analytics, Reports

10Analytics & Reports

At a glance
Analytics & Reports

Live dashboards for leadership, planners and analysts, and branded PDF and Excel reports that can also be scheduled for email delivery. Work-plan figures come only from submitted or accepted quarters of the current strategic plan.

Who uses it

WhoDoes what
Managersexecutive and module dashboards
Analysts and reviewersprogress dashboards, explorer, delivery reports
EveryoneMy Workbench

Key concepts

  • Single source of truth — Work-plan delivery figures come from Progress Insights: submitted or accepted quarters of the current strategic plan only.
  • Performance — The mean of capped achievement ÷ target ratios. One vocabulary everywhere: Above target, On target, Below target (rounded to the whole per cent).
  • Scheduled reports — Run as their owner, reach only active KnowledgeWeb users, and pause with a reason if the owner loses access.

The screens

Executive dashboard
Executive dashboard
Planning Cycle: stations × quarters, plan quality, deadlines
Planning Cycle: stations × quarters, plan quality, deadlines
Progress Analysis
Progress Analysis
Report catalogue: generate PDF or Excel
Report catalogue: generate PDF or Excel

How to

Read the dashboards

  1. Dashboard > Executive for the headline figures; Dashboard > My Workbench for your own pending items. Planning > Overview shows how the year's delivery is going through your own lens.
  2. Analytics > Planning & Progress: Planning Cycle, Plan Budget, Strategic Plan Scorecard, Progress Analysis, Progress Explorer and My Station Scorecard. Planning > Progress Tracking: Progress Tracker, County Summary, Feedback & Comments.
  3. Analytics > Investments: Investment Analytics and Investment Tracker. Operations: Activity Requests and Resources.
  4. Filters (fiscal year, quarter or year to date, counties/HQ, station, objective) apply to every panel on the page.

Generate a report

  1. Reports > Report Catalogue lists the reports you are allowed to run.
  2. Click Generate, choose the parameters and format (PDF or Excel).
  3. Reports > Report History re-downloads anything generated before. Progress Reports offers the delivery reports in one place.

Schedule a report

  1. Reports > Scheduled Reports > New Schedule: report, format, frequency and recipients.
  2. Recipients must be active KnowledgeWeb users. The report runs as you and contains only what you can see.

Rules and behaviour

  • A 'station' is a reporting office: a county or an HQ department.
  • Progress is described in three bands only: Above target, On target, Below target (achievement ÷ target, rounded to the whole per cent).
  • Delivery figures are shown to HQ progress analysts only; others see plan structure.

Permissions used

Permission keyAllowsScopable
dashboards.view-executiveView executive dashboard—
dashboards.view-investmentsView investment analyticsYes
dashboards.view-planningView planning analyticsYes
dashboards.view-activitiesView activity analyticsYes
dashboards.view-resourcesView resource analyticsYes
dashboards.view-trackerView investment tracker mapYes
dashboards.view-adminView system health dashboard—
Part B · Knowledge AI

11Knowledge AI

At a glance
Knowledge AI

Ask questions in plain English (or Swahili) about NDMA's published documents and investments. Every answer cites its sources. The same engine powers document auto-fill and investment drafting.

Who uses it

WhoDoes what
Staff with ai.usechat and semantic search

Key concepts

  • Retrieval — Answers are grounded in the published documents and investments indexed for search, with citations.
  • Auto-fill — Document upload and investment drafting reuse the same engine and show the evidence quote for each field.

The screens

Knowledge Assistant: answers cite their source records
Knowledge Assistant: answers cite their source records

How to

Ask the assistant

  1. Knowledge AI > Chat; type a question or pick a suggestion.
  2. Open a citation card to go to the source record. Conversations keeps your history.
  3. Semantic Search returns the closest documents and investments by meaning.

Rules and behaviour

  • AI suggestions are drafts. Always check them against the source before saving.

Permissions used

Permission keyAllowsScopable
ai.useUse AI search, chat & summarization—
Part B · Public site (no sign-in)

12Public Portal

At a glance
Public Portal

The open atlas of Kenya's drought resilience work: published investments, the funds tracker, the Resource Library and bulletins, search, and email subscriptions. No sign-in is needed.

Who uses it

WhoDoes what
Citizens, partners, mediabrowse, search, download, subscribe

Key concepts

  • What is public — Approved/published investments and published documents only — called resources on the portal.
  • Partners — Funding and implementing partners are listed A–Z; the portal never ranks or compares them.
  • Subscriptions — Double opt-in; a daily round-up of what was published since each subscriber's own last email; one-click unsubscribe.

The screens

Public home: the open atlas
Public home: the open atlas
Investment register
Investment register
Resource Library
Resource Library
Bulletin record: counties × months
Bulletin record: counties × months

How to

Use the portal

  1. Home: search everything, or explore by category and county.
  2. Investments: filter by county, sector, partner, category, status and micro or macro; open a profile for its map, delivery and PDF/Excel.
  3. Tracker: the live funds and delivery survey, with the same filters. Resources: browse, list, gallery or explorer views; Bulletins: the counties × months record; Early Warning: each county's drought phase month by month.
  4. Subscribe: choose topics and a county; confirm from the email to start receiving the daily round-up.

Rules and behaviour

  • Only approved and published records appear. Unpublishing in the Registry removes them.
  • The portal names its partners (those who fund and those who implement) in an A–Z list; it never ranks or compares them.
Part B · Planning > Activity Requests

13Activity Requests

At a glance
Activity Requests

Plan field missions and activities: purpose, budget, team, itinerary and travel; parallel Finance, HR and M&E checks; final AIE approval; data collection and sign-off afterwards.

Who uses it

WhoDoes what
Requesterscreate and submit
Finance / HR / M&E checkersreview in parallel
AIE holdersfinal approval

Key concepts

  • Review streams — Finance, HR and M&E checks run in parallel; AIE approval follows when all three have approved.

How to

Raise and track a request

  1. Planning > Activity Requests > New Request: details, funds and logistics, budget lines, team, itinerary and travel; save and Submit.
  2. Checkers act from Pending Reviews; the AIE holder approves once Finance, HR and M&E have approved.
  3. After the activity, complete the data collection forms and sign off under Sign-Offs.

Rules and behaviour

  • Not part of this week's UAT scope; available for familiarisation.

Permissions used

Permission keyAllowsScopable
activityrequests.viewView activity requests—
activityrequests.createCreate activity requests—
activityrequests.updateEdit activity requests—
activityrequests.deleteDelete draft activity requests—
activityrequests.manage-mailinglistsManage M&E mailing lists—
activityrequests.finance.allocateAllocate funds (Finance)—
activityrequests.finance.approveApprove finance check—
activityrequests.hr.allocateAllocate logistics (HR)—
activityrequests.hr.approveApprove HR check—
activityrequests.mecheck.approveApprove M&E check—
activityrequests.aie.approveFinal AIE approval—
activityrequests.aie.rejectReject activity request—
Part B · Approvals

14Approvals in depth: plan review

Strategic plans, national/HQ/county work plans and plan-unlock requests open on a read-only plan review page (/approvals/{id}/plan) rather than a summary. The approver sees the whole plan — every objective and indicator, with targets and budgets — can download it to Excel and read indicator notes, and approves or returns from the same page.

Plan review: the approver reads the full plan before deciding
Plan review: the approver reads the full plan before deciding
  • Who may open it is decided by the approval record (submitter, any approver on the process, a delegate, anyone who acted, or a superadmin) — not by planning permissions.
  • An HQ approver sees the whole plan here, not only their own department's objectives.
  • Every approval email links straight to this page for plan records, and to Pending Approvals for everything else.
Approval Tracking Report with turnaround and status filters
Approval Tracking Report with turnaround and status filters
Part B · Planning

15Locks, unlock windows and the change report

Plan statePlanned figuresAchievementsNotes
Draft / returnedEditable—Editable
Awaiting approvalFrozen for everyoneFrozenRead-only
Approved (locked)FrozenCaptured in Progress ReportingRead-only
Approved + unlock window openEditable until the window closes or expiresProgress ReportingEditable
  • Approval is the lock: IsLocked is never cleared. An unlock request (itself approved) opens a window; closing it is one click (Finish & re-lock) and expiry needs no job to run.
  • Only one request may be open or pending per plan at a time; a plan open for editing cannot be re-submitted for approval.
  • The change report lists what was touched while the window was open and by whom (from record timestamps, not before/after values).
  • Reopening a plan keeps a version before and after. Re-locking a national plan that changed pushes the changes into the existing HQ and county plans and tells their staff what changed.
Planning > Work Plans > Unlock Requests
Planning > Work Plans > Unlock Requests

Editing a plan in Excel

  • Edit in Excel (national, HQ and county) downloads the plan grouped by its strategic-plan hierarchy, with hidden keys and a version stamp per row.
  • Upload previews every change; nothing is written until you save, and then everything is saved or nothing is.
  • Refused: rows from another plan, moved columns, text in number cells, negative numbers, percentages outside 0–100, unknown budget lines, a changed SP Target, and any row changed in the app since the file was downloaded.
  • Warnings you acknowledge: quarters that do not add up to the annual target, money without a budget line.
Part C · Administration

16Administration guide

More > Admin
Running the platform

Everything an administrator needs: users and permissions, master data, approval processes and document routing, audit trail, logins and sessions, settings, subscribers, exchange rates, announcements, data import/export, DRIP and legacy migration.

Administration control panel
Administration control panel

Set-up checklist (in order)

1. Configure the server

ICT sets App:BaseUrl (the address used in every email link), the SMTP account, and optionally the AI key. These are server settings, not pages; see the Technical section.

2. Load master data

Admin > Master Data: check Counties (with GPS and contact emails), Sub-Counties, Wards, Directorates, Departments, Pillars, Priority Action Areas, Sectors, Fund Sources, Stakeholder Organisations, Funding Agreements, Budget Lines, Document types and Early Warning (livelihood zones and trends). Pick a category on the left, then Add New, edit or deactivate.

Load master data
Load master data

3. Create user accounts

Admin > Users > New user: names, email, position, department, county and line manager, a Starting Permission Template and a temporary password. The user must change it at first sign-in.

Create user accounts
Create user accounts

4. Set placement correctly

A person's County decides what they reach: no county, or the county named HQ, makes them HQ staff; any other county makes them county staff, confined to that county.

5. Grant permissions

Users > Manage permissions (or Admin > Permissions Matrix): tick capabilities per module and choose a scope (Global, Own County, Own Department or a specific unit), then Save Changes. The user signs out and in again to pick up changes.

Grant permissions
Grant permissions

6. Build approval processes

Admin > Approvals > New Process: name it, Add Level 1, 2… and choose the approvers for each level (any one can act). Optionally require an e-signature.

Build approval processes
Build approval processes

7. Route documents

Admin > Document Routing: link each document classification to the approval process its documents should follow.

8. Prepare planning

On the strategic plan: map each strategic objective to the departments that deliver it (SO Mappings), then under Progress submission choose each department's primary objective and tick any others it may also submit. Mark the plan current (More > Set as current). HQ department staff see nothing until objectives are mapped, and submit progress only for their primary and allowed objectives.

Prepare planning
Prepare planning

9. Set up download protection

Admin > Download Protection (needs documents.protection-settings): create the protection profiles (or the three starter profiles) and recommend one for each document classification or type. Publishers then publish with the recommended profile in one click. Install LibreOffice on the server so Office files can be converted to PDF.

10. Grant reviewer and analyst rights

Give workplans.review-progress to the HQ M&E reviewers, workplans.progress-insights to analysts, documents.protection-settings to whoever sets up download protection, and investments.publish / documents.publish to the HQ publishers. None is granted to anyone by default.

11. Announce go-live

Admin > Overview > Announcements: title, message and an optional link; Send (click twice to confirm). It reaches every active user in-app and by email.

Announce go-live
Announce go-live

The access model

  • A grant is the presence of a permission for a person, with a scope: Global, Own County, Own Department, Specific County or Specific Department.
  • Own County / Own Department follow the person's profile, so a grant moves with them when their county changes.
  • system.superadmin bypasses every check. Use it for set-up and support only.
  • Two capabilities are granted to nobody by default and must be given deliberately: workplans.review-progress and workplans.progress-insights.
  • Some rights are not permissions at all: approvers are named on approval levels; activity-request owners act on their own requests; investment collaborators are named per record.

Permission templates

TemplatePurpose
Standard StaffDefault access matching what all staff could do before the matrix
County StaffStandard Staff scoped to the person's own county for data-heavy modules
AIE HolderStandard Staff plus final activity-request approval
Finance / HR / M&E CheckerStandard Staff plus the matching activity-request review stream
Knowledge Management ChampionStandard Staff plus training content management
External PartnerA narrow, view-only starting point for external accounts
Administrator (Super Admin)Full access; the baseline is granted alongside superadmin
All-users permissions matrix
All-users permissions matrix

Users

  1. Admin > Users: search and filter Active / Inactive.
  2. Edit to change details; Reset password issues a temporary one; Deactivate stops sign-in and revokes sessions.
  3. Manage permissions: tick capabilities, choose scope, Save Changes. Super Administrator is a separate switch.
  • Deactivating a user stops sign-in and revokes their refresh tokens; the account stays in the Inactive list.
  • Reset password issues a policy-compliant temporary password and forces a change at next sign-in.
  • Password policy: at least 8 characters with upper case, lower case, a number and a symbol; the last 5 passwords cannot be reused; 5 failures lock the account for 15 minutes.

Approval processes and document routing

  1. Admin > Approvals > New Process: name, description, optional county (blank = global).
  2. Add Level 1, 2 … and pick one or more approvers per level; optionally require an e-signature.
  3. Admin > Document Routing: map each document classification to a process.
  4. Planning, investment and document submitters choose the process when they submit.

Master data

Reference lists used across modules, grouped on the left of Admin > Master Data: Geography (counties with GPS and finance/procurement emails, sub-counties, wards), Organisation (directorates, departments), Sectors & Themes (pillars, sectors, themes), Funding (funding source types, fund sources, funding agreements, budget lines), Partners (stakeholder organisations, beneficiaries) and Documents (classifications, categories, types). Parents are chosen from dropdowns; deactivating keeps history intact.

Monitoring and security

  1. Audit Trail: filter by user, entity and date; Details shows before and after values.
  2. Logins: every sign-in attempt. Sessions: who is signed in; Terminate signs a session out within about 30 seconds.
  3. Analytics > System Health: sign-ins, failures and recent audit events.
Audit Trail with filters and before/after details
Audit Trail with filters and before/after details

Other administration pages

PagePurpose
SettingsKey/value application settings (none are seeded)
Exchange RatesKES rates for other currencies used in investment budgets
SubscribersRead-only list of public subscribers, their topics and last round-up; people leave only via their own unsubscribe link
AnnouncementsSend an in-app + email notice to all active staff
Data > Import / Export / Import HistoryTemplate-driven bulk import with row-level errors; export of key lists to Excel, CSV or PDF
DRIP IntegrationConnection to the DRIP proposal system for importing investments
Legacy MigrationIdempotent, logged migration of KMSLive data, domain by domain
Analytics > System HealthSign-ins, failures, users by placement and recent audit events
  1. Admin > Download Protection (documents.protection-settings).
  2. Create three starter profiles, or New profile: licence and holder, footer, watermark, licence page, and copy/print/edit restrictions. One profile is the default.
  3. Recommended for: pick a profile per document classification or type; a type without its own follows its classification, then the default.
  4. The page also shows whether the PDF converter (LibreOffice) is ready on the server.
Data > Import with template download
Data > Import with template download
Part D · Technical

17System requirements

Users' devices

ItemRequirement
BrowserCurrent Microsoft Edge or Google Chrome (Firefox and Safari work; the training pack is tested on Edge/Chrome)
Screen1366 × 768 or larger recommended; layouts adapt to tablets and phones
ConnectionStable broadband; the staff application keeps a live connection (WebSockets) to the server
PasskeysWindows Hello, Touch ID, Android biometrics or a FIDO2 security key
Two-factorAny TOTP authenticator app (Microsoft or Google Authenticator, Authy …)
Office filesExcel for the planning and import round-trips; previews open in the browser

Server

ComponentRequirement
Operating systemWindows Server 2019/2022 with IIS 10 (production today), or any OS running Kestrel behind a reverse proxy
Runtime.NET 10 ASP.NET Core Hosting Bundle (framework-dependent, win-x64)
IIS featuresWebSocket Protocol enabled (Blazor Server); Web Deploy for publishing
DatabaseSQL Server 2019/2022, a dedicated SQL login (not sa), encrypted connections
Memory / CPUMinimum 4 vCPU, 8 GB RAM for the application; size SQL Server separately
StorageSpace for uploads under the configured storage path (documents, attachments, covers), outside the web root, backed up with the database
TLSA valid certificate for the public host name; HTTPS only (HSTS)

External services

ServiceNeeded forRequired?
SMTP mail accountEvery email: approvals, password reset, notifications, digests, subscriber round-ups, scheduled reportsYes
OpenAI APIKnowledge AI chat and search, document auto-fill, investment and quiz drafting, narrativesOptional
Qdrant vector databaseSemantic search and AI answers over documents and investmentsOptional
DRIPImporting investment proposalsOptional
Map tiles (OpenStreetMap / CARTO)Investment maps in the browserYes (internet access from browsers)
Part D · Technical

18Installation and configuration

Deployment

  1. Provision SQL Server and create an empty database and a dedicated login with db_owner on it.
  2. Install the .NET 10 Hosting Bundle on the web server, enable WebSockets, create the IIS site and HTTPS binding.
  3. Set configuration (below) through environment variables or appsettings.Production.json — never commit secrets.
  4. Publish from the solution with the Production profile (Release, win-x64, EnvironmentName=Production) using Web Deploy, or copy a `dotnet publish` output.
  5. Apply database migrations (dotnet ef database update, or run the generated idempotent script).
  6. Start the site. On first start the application seeds the permission catalog, templates and reference data, and creates the initial administrator account.
  7. Sign in as the initial administrator, change the password, then follow the administrator set-up checklist.

Configuration keys

KeyPurpose
App:BaseUrlPublic address used in every email link, share link and certificate link — production: https://kms.fabtechcloud.com
ConnectionStrings:DefaultConnectionThe KnowledgeWeb SQL Server database
ConnectionStrings:LegacyKMSLiveLegacy KMS database, only for the migration tool
Jwt:Secret / Issuer / Audience / ExpirationMinutesToken signing; access tokens default to 15 minutes, refresh tokens 7 days
EmailConfiguration:From / FromName / SmtpServer / Port / UserName / Password / EnableSslOutgoing mail
FileStorage:BasePathRoot folder for uploaded files
ServerDomain / OriginsPasskey (WebAuthn) relying-party domain and allowed origins
AI:OpenAI:Enabled / ApiKey / Model / EmbeddingModelAI engine (optional)
AI:Qdrant:Host / Port / ApiKey / UseTls / …CollectionVector store (optional)
AI:Pipeline:EmbeddingsEnabled / BatchSize / PollIntervalSecondsBackground indexing of published content
Integration:Drip:BaseUrl / KeyId / Secret / EnabledDRIP integration (optional)
ProgressReminders:EnabledDaily progress reminders from 3 days before a quarter ends to the 5th (06:00 UTC)
PdfConversion:Engine / LibreOfficePath / GotenbergUrlOffice-to-PDF conversion for publishing; LibreOffice must be installed on the server (or a Gotenberg URL set)
PublicSubscriptions:EnabledDaily subscriber round-up (08:00 UTC)
Thumbnails:EnabledRendering of document cover images

Any key can be set as an environment variable with __ in place of :, e.g. App__BaseUrl.

Background services

ServiceWhat it doesWhen
Email senderSends queued email with retriesContinuous
Approval SLA remindersReminds approvers of overdue records; escalates to super administratorsPeriodic
Progress remindersDaily reminders to stations that have not submitted, from 3 days before the quarter ends to the 5th; the last copies the reviewersDaily 06:00 UTC
Plan re-lock finaliserWhen an unlock window ends, records the after-version and cascades national changesEvery 5 min
PDF converter warm-upPrepares LibreOffice shortly after start so the first conversion is quickOnce at start
Scheduled reportsGenerates and emails scheduled reports as their ownerHourly check
Subscriber round-upEmails confirmed public subscribers what was published since their last emailDaily 08:00 UTC
Notification digestsDaily / weekly digest of unread notifications07:00 UTC; weekly on Monday
Training remindersDue and overdue course assignmentsPeriodic
Document coversRenders a cover image for PDF documentsPeriodic
AI embeddingsIndexes newly published documents and investments for searchEvery 60 s (if enabled)

Operations

  • Logs — Serilog writes structured logs to the console and rolling files under logs/ in the application folder.
  • Health — /health and /alive are mapped in Development only; in production monitor the site URL and the logs.
  • API documentation — Swagger UI (/swagger) is enabled in Development; the REST API lives under /api/v1 with JWT bearer authentication.
  • Backups — Back up the SQL database and the uploads folder together. Documents store the absolute path of their file, so restore files to the same path (or update the paths) when moving servers.
  • Rate limits — Global 100 requests/min per IP; sign-in endpoints 10 per 5 min; API 50/min per user.
Part D · Technical

19Architecture and security

Technology stack

LayerTechnology
Runtime / UI.NET 10, Blazor Server, MudBlazor 9
APIASP.NET Core controllers (/api/v1), Swashbuckle, FluentValidation
DataEntity Framework Core 10 on SQL Server; one AppDbContext; soft delete and audit stamps on every entity
IdentityASP.NET Core Identity, JWT bearer, TOTP two-factor, FIDO2 passkeys (Fido2), DataProtection
DocumentsQuestPDF (PDF), ClosedXML / OpenXML (Excel), PdfPig and PDFtoImage (text and covers)
AIOpenAI (chat + embeddings), Qdrant vector store, Microsoft.ML tokenizers
LoggingSerilog (console, rolling file), OpenTelemetry via .NET Aspire service defaults
Orchestration (dev).NET Aspire AppHost

Solution structure

FolderContents
Features/<Module>Vertical slices: controller, service + interface, DTOs, validators per module (Investments, Documents, StrategicPlanning, WorkPlans, Approvals, Training, Dashboards, Reports, Public, AI, Notifications, Administration, DataImportExport, ActivityRequests, Auth)
ComponentsBlazor layouts, pages (Auth, Private/<module>, Public) and shared components
CoreEntities, enums, constants (PermissionKeys), interfaces
DataAppDbContext, entity configurations, migrations, seed data
ServicesCross-cutting: email, file storage, audit, authorization (permission policy provider, current-user context)
Hubs / MiddlewareSignalR hubs; exception handling, security headers, county-staff restriction
tests/Unit tests and integration tests against a real SQL Server (incl. UAT-tagged tests)

Security controls

ControlImplementation
AuthenticationIdentity + JWT (15-min access, 7-day rotating refresh), TOTP 2FA with recovery codes, passkeys
Passwords8+ chars, mixed case, digit, symbol; history of 5; forced change for temporary passwords
Lockout5 failed attempts → 15-minute lockout, audited
AuthorizationPermission policies on every page, endpoint and service; county/department scoping in services
Transport & headersHTTPS + HSTS, CSP, X-Frame-Options, X-Content-Type-Options, Referrer-Policy, Permissions-Policy
Rate limitingGlobal, sign-in and API tiers
UploadsWhitelisted extensions, 50 MB limit, stored outside the web root with generated names
Data accessEF Core parameterised queries; soft delete; audit of administrative actions and sign-ins
Public portalAnonymous endpoints expose only approved/published content; protected actions never live on anonymous controllers

Data model by domain

DomainMain entities
Identity & accessApplicationUser, Permission, UserPermission, PermissionTemplate, RefreshToken, UserPasskey, LoginAttempt, UserSession, AuditLog
Master dataCounty, SubCounty, Ward, Directorate, Department, Pillar, Sector, Theme, FundSource, FundingAgreement, StakeholderOrganization, Beneficiary, BudgetLine
InvestmentsInvestment + counties, sectors, fund sources, outputs, indicators, targets/achievements, coordinates, keywords, attachments, collaborators
DocumentsDocument, DocumentType/Classification/Category, keywords, access, share tokens, hits, publish actions, content subscriptions
Strategic planningStrategicPlan, issues, goals, KRAs, outcomes, objectives, strategies, activities, outputs, PerformanceIndicator, YearlyTarget, YearlyBudget, SO mappings
Work plans & progressNational/HQ/County work plans, activities, outputs, indicators, *IndicatorFundSource, progress submissions, events, review flags, indicator notes, unlock requests
ApprovalsApprovalProcess, ApprovalLevel, ApprovalLevelApprover, ApprovalRecord, ApprovalHistory, delegations
TrainingCourse, module, material, enrolment, assessment, question, attempt, certificate, feedback
PlatformInAppNotification, NotificationPreference, ScheduledReport, GeneratedReportHistory, ImportJob, ChatConversation, ChatMessage

Quality assurance

  • Unit tests and integration tests run on every push (GitHub Actions) against SQL Server; the release pipeline is gated on them.
  • Every one of the 204 UAT cases has at least one automated test tagged with its case ID.
  • A link checker verifies every internal link and navigation target against the application's real routes.
Part D · Technical

20Troubleshooting

SymptomLikely causeWhat to do
Emails not arrivingSMTP settings, or the user switched email offCheck EmailConfiguration and the logs; check the user's notification preferences; in-app notices still arrive
Links in emails point to the wrong hostApp:BaseUrlSet App:BaseUrl (or App__BaseUrl) to the public address
Preview/download returns 404 after a moveFiles not at their stored absolute pathCopy the uploads to the same path, or update stored paths
Page shows 'Access refused'Missing permissionGrant it; the user signs out and in
HQ officer sees an empty HQ planNo SO mapped to their departmentMap objectives on SO Mappings (needs an unlock request on a locked plan)
Cascade buttons disabledNational plan not approvedSubmit and approve the national plan first
Cannot submit progressPlan not approved, quarter not started, or already submittedSee the Progress Reporting rules
AI features show offlineAI:OpenAI not enabled or key missingConfigure the key, or mark AI cases Not tested
Signed out unexpectedlySession terminated by an administrator, or token expirySign in again
Appendices

21Appendix A — Roles and personas

Typical profiles used in training and UAT. Each is a set of permissions, not a fixed role.

ProfileWhat they doTypical permissionsModules
Super AdminSet-up and support. Bypasses every permission check.system.superadminAll
AdministratorUsers, permissions, master data, approval processes, audit, sessions, settings, announcements.administration.*, approvals.processes.manage, notifications.broadcastAdmin
HQ PlannerBuilds the strategic plan and national work plan; runs the cascade; bulk-imports investments.strategicplanning.*, workplans.create/update/manage-lifecyclePlanning, Investments
HQ Department OfficerPlans the HQ entries of the objectives mapped to their department; captures and submits progress for the department's primary objective and any others the administrator allows.workplans.view/update/submit-progressPlanning, Progress
County Officer (CDC)County investments, bulletins, county work plan and quarterly progress, scoped to own county. Only county staff change their county's plan.investments.*, documents.*, workplans.* (Own County)Investments, Documents, Planning, Progress
ApproverNamed on approval levels; approves or returns records and plans (there is no reject).approvals.records.* (named on a level)Approvals
PublisherHQ staff who release approved investments and PDF documents to the public portal, converting Office files to PDF and choosing download protection.investments.publish, documents.publishRegistry
Progress ReviewerHQ M&E officer who accepts or returns submitted quarterly progress.workplans.review-progressProgress
Progress Analyst / ManagerReads dashboards, scorecards and reports; schedules reports.dashboards.view-*, workplans.progress-insights, reports.*Analytics, Reports
TrainerBuilds courses, assessments and assigns learners.training.manageTraining
Staff member / LearnerTakes courses, uses Knowledge AI, reads what they are allowed to.sign-in (+ baseline)Training, AI
Public visitorBrowses the open atlas: investments, tracker, resources, bulletins; subscribes.anonymousPublic portal

Training & UAT week

DayModulesUAT cases
Tue 10 NovOrientation · Administration · Public PortalADM-001–031, PUB-001–021
Wed 11 NovInvestments · Resource CenterINV-001–030, DOC-001–025
Thu 12 NovPlanning: strategic plans, work plans & progress reportingPLN-001–044
Fri 13 NovTraining (LMS) · Analytics & Reports · UAT close-out & ToTTRN-001–022, ANL-001–031

Pass mark: 85% combined weighted score. Persona accounts and starting records are listed in the UAT dataset handout.

Appendices

22Appendix B — Permission catalogue

Every grantable capability, as seeded. 'Scopable' permissions can be limited to a county or department.

KeyModuleAllowsScope
system.superadminSystemSuper Administrator—
investments.viewInvestmentsView investmentsYes
investments.createInvestmentsCreate investmentsYes
investments.updateInvestmentsEdit investmentsYes
investments.manage-subresourcesInvestmentsManage counties/sectors/funders/outputs etc.Yes
investments.deleteInvestmentsDelete investments—
investments.publishInvestmentsPublish investments to the public portal—
documents.viewDocumentsView documentsYes
documents.createDocumentsUpload documentsYes
documents.updateDocumentsEdit document metadataYes
documents.deleteDocumentsDelete documents—
documents.publishDocumentsPublish documents to the public portal—
documents.protection-settingsDocumentsSet up download-protection profiles—
documents.manage-foldersDocumentsManage document foldersYes
documents.manage-accessDocumentsManage document sharing & accessYes
documents.manage-keywordsDocumentsManage document keywordsYes
documents.manage-subscriptionsDocumentsManage document-type subscriptionsYes
strategicplanning.viewStrategic PlanningView strategic plans—
strategicplanning.createStrategic PlanningCreate strategic plans—
strategicplanning.updateStrategic PlanningEdit strategic plans—
strategicplanning.manage-lifecycleStrategic PlanningLock/import/auto-number plans—
strategicplanning.deleteStrategic PlanningDelete strategic plans—
strategicplanning.request-unlockStrategic PlanningRequest reopening of a locked plan—
workplans.viewWork PlansView national/HQ/county work plansYes
workplans.createWork PlansCreate work plansYes
workplans.updateWork PlansEdit work plans, activities & indicatorsYes
workplans.manage-lifecycleWork PlansSubmit/approve/generate HQ & county plansYes
workplans.submit-progressWork PlansSubmit quarterly progressYes
workplans.review-progressWork PlansReview submitted progressYes
workplans.submit-feedbackWork PlansSubmit quarterly feedbackYes
workplans.deleteWork PlansDelete national work plans—
workplans.request-unlockWork PlansRequest reopening of a locked work planYes
workplans.progress-insightsWork PlansView progress insights & reportsYes
activityrequests.viewActivity RequestsView activity requests—
activityrequests.createActivity RequestsCreate activity requests—
activityrequests.updateActivity RequestsEdit activity requests—
activityrequests.deleteActivity RequestsDelete draft activity requests—
activityrequests.manage-mailinglistsActivity RequestsManage M&E mailing lists—
activityrequests.finance.allocateActivity RequestsAllocate funds (Finance)—
activityrequests.finance.approveActivity RequestsApprove finance check—
activityrequests.hr.allocateActivity RequestsAllocate logistics (HR)—
activityrequests.hr.approveActivity RequestsApprove HR check—
activityrequests.mecheck.approveActivity RequestsApprove M&E check—
activityrequests.aie.approveActivity RequestsFinal AIE approval—
activityrequests.aie.rejectActivity RequestsReject activity request—
approvals.processes.viewApprovalsView approval process configuration—
approvals.processes.manageApprovalsConfigure approval processes/levels/approvers—
approvals.records.submitApprovalsSubmit a record for approval—
approvals.records.view-tracking-reportApprovalsView the approval tracking report—
dashboards.view-executiveDashboardsView executive dashboard—
dashboards.view-investmentsDashboardsView investment analyticsYes
dashboards.view-planningDashboardsView planning analyticsYes
dashboards.view-activitiesDashboardsView activity analyticsYes
dashboards.view-resourcesDashboardsView resource analyticsYes
dashboards.view-trackerDashboardsView investment tracker mapYes
dashboards.view-adminDashboardsView system health dashboard—
reports.view-catalog-and-generateReportsView & generate reportsYes
reports.manage-scheduledReportsManage scheduled reports—
administration.users.viewAdministrationView users—
administration.users.manageAdministrationCreate/edit/deactivate users, reset passwords—
administration.masterdata.viewAdministrationView master data—
administration.masterdata.manageAdministrationManage master data & counties—
administration.audit.viewAdministrationView the audit trail—
administration.sessions.viewAdministrationView active sessions—
administration.sessions.manageAdministrationTerminate sessions—
administration.loginhistory.viewAdministrationView login history—
administration.settings.viewAdministrationView system settings—
administration.settings.manageAdministrationManage system settings—
administration.permissions.manageAdministrationManage the permission matrix—
administration.integrations.manageAdministrationConfigure external system integrations—
administration.subscribers.viewAdministrationView public subscribers—
administration.exchangerates.manageAdministrationManage exchange rates—
ai.useAIUse AI search, chat & summarization—
dataimportexport.importData Import/ExportBulk import data—
dataimportexport.exportData Import/ExportBulk export data—
dataimportexport.view-historyData Import/ExportView import history—
notifications.broadcastNotificationsSend a broadcast notification to all users—
training.manageTrainingManage training content—
legacymigration.runLegacy MigrationRun the legacy KMSLive data migration tool—
Appendices

23Appendix C — Page index

MenuPageAddress
DashboardLanding page/dashboard
InvestmentsAll · My · New · Partner · Registry · Map View/investments · /investments/my · /investments/new · /investments/partner/new · /investments/registry · /investments/map
DocumentsAll · Upload & Submit · Upload · Bulk County Bulletins · My · Explorer · Registry/documents · /documents/submit · /documents/upload · /documents/bulletins/bulk · /documents/my · /documents/explorer · /documents/registry
PlanningOverview · Strategic Plans/planning · /strategic-plans
PlanningWork Plans: National · HQ · County · Unlock Requests/work-plans/national · /work-plans/hq · /work-plans/county · /planning/unlock-requests
PlanningProgress Reporting: Capture · Review Queue · Review Operations/progress · /progress/review · /progress/review/operations
PlanningProgress Tracking: Tracker · County Summary · Feedback & Comments/progress/tracker · /progress/county-summary · /progress/feedback
PlanningActivity Requests/activity-requests (… /new, /pending, /sign-offs, /all)
TrainingCatalogue · My Learning · My Certificates · Manage/training · /training/my-learning · /training/certificates · /training/manage
ApprovalsPending · My Submissions · Tracking Report/approvals/pending · /approvals/my-submissions · /approvals/tracking
DashboardExecutive · My Workbench/dashboard · /dashboards/my
AnalyticsPlanning Cycle · Plan Budget · Strategic Plan Scorecard · Progress Analysis · Progress Explorer · My Station Scorecard · Investment Analytics · Tracker · Activities · Resources · System Health/dashboards/planning · /dashboards/planning/budget · /strategic-plans/scorecard · /dashboards/progress · /dashboards/progress/explore · /dashboards/my-scorecard · /dashboards/investments · /dashboards/tracker · /dashboards/activities · /dashboards/resources · /dashboards/admin
ReportsCatalogue · Progress Reports · Scheduled · History/reports · /reports/progress · /reports/scheduled · /reports/history
Knowledge AIChat · Semantic Search · Conversations/ai/chat · /ai/search · /ai/conversations
AdminOverview · Users · Permissions Matrix · Master Data · Approvals · Document Routing · Download Protection · Audit Trail · Logins · Subscribers · Sessions · Settings · Exchange Rates · DRIP · Legacy Migration/admin · /admin/users · /admin/permissions-matrix · /admin/master-data · /admin/approval-processes · /admin/document-workflows · /admin/download-protection · /admin/audit-trail · /admin/login-history · /admin/subscribers · /admin/sessions · /admin/settings · /admin/exchange-rates · /admin/integrations/drip · /admin/migration
DataImport · Export · Import History/data/import · /data/export · /data/import/history
ProfileProfile · Change Password · Two-Factor · Passkeys · Notifications/profile · /profile/change-password · /profile/2fa · /profile/passkeys · /profile/notifications
PublicHome · Investments · Tracker · Resources · Bulletins · Early Warning · Search · Subscribe · Verify certificate/public · /public/investments · /public/tracker · /public/resources · /public/bulletins · /public/early-warning · /public/search · /public/subscribe · /public/verify-certificate
Appendices

24Appendix D — Decisions pending

Working as built; flagged for the product owner because the behaviour may not match expectations. Changing any of them changes who can do what.

TopicCurrent behaviour
UnpublishAn Approved record is already public, so unpublishing does not remove it from the public site.
System settingsNo settings are seeded; the Settings page starts empty.
Currency displayNo per-investment KES equivalent is shown.
Course Builder ownershipAny training.manage holder can edit another trainer's course by URL.
Share links and keywordsAny documents.view holder can manage share links and keywords on documents they can open.
Unlock requestsThe list is visible to all planning users; Re-lock has no separate permission.
Bulk fund-source APIPUT /api/v1/work-plans/{hq|county}/{id}/fund-sources/bulk checks sign-in only; the UI path is permission-checked.
Remember meThe checkbox on the sign-in page has no effect.
Dark modeThe choice is not remembered after reload.
↑ Back to top

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please reload the page.