NDMA KnowledgeWebPro (KnowledgeWeb), .NET 10 Blazor Server platform
Version
1.0 — prepared for Training & UAT, Machakos, 10–13 November 2026
Owner
NDMA ICT and Planning Department, with FABTECH Solutions Ltd
Production address
https://kms.fabtechcloud.com
Audience
All users (Parts A–B), administrators (Part C), ICT and developers (Part D)
Companion documents
Quick User Manual (PDF) · User Overview deck (PowerPoint) · UAT Test Scripts & Scoresheet (Excel) · UAT Readiness Report
How this document is organised
Part A — Introduction — what KnowledgeWeb is, the core concepts and a glossary.
Part B — User guide — getting started, then one chapter per module with screens, procedures and rules.
Part C — Administration — setting up and running the platform: users, permissions, workflows, master data, monitoring.
Part D — Technical — requirements, installation, configuration, architecture, security, operations and troubleshooting.
Appendices — roles, the full permission catalogue, the page index and decisions pending.
Conventions
Menu paths are written Module > Page > Button, exactly as labelled on screen.
Permission keys appear in monospace, e.g. workplans.review-progress.
Screenshots come from the UAT environment and show synthetic test data.
Revision history
Version
Date
Change
1.0
9 Nov 2026
First complete edition for Training & UAT
Part A · Introduction
1Introducing KnowledgeWeb
KnowledgeWeb is the National Drought Management Authority's knowledge and performance platform. It replaces the legacy KMS (ASP.NET WebForms, two disconnected databases, 156 pages) with one secure, modern application where NDMA records its drought-response investments, publishes its knowledge, plans its work from the strategic plan down to each county, reports quarterly progress and analyses delivery — with a public portal that opens the record to citizens.
ASP.NET Core Identity, JWT, two-factor, passkeys, lockout
Access
Role flags on the staff record
Fine-grained permissions with county/department scope
Approvals
Per-module, hard-coded
One multi-level engine for every record type
Planning
SP_ and PME_ duplicate tables
Strategic plan → national → HQ/county cascade, quarterly progress review
Insight
FusionCharts / DevExpress dashboards
Live dashboards, scorecards, PDF/Excel reports, scheduling
New
—
Training LMS, Knowledge AI, public open atlas, notifications, Excel round-trips
Core concepts
Permissions, not roles — Every capability is a permission (e.g. investments.publish) granted to a person, optionally limited to a county or department. Nothing is implied by a job title.
Placement — A person's county on their profile decides whether they are HQ staff (no county, or the county named HQ) or county staff (confined to that county).
Approval workflow — Investments, documents, plans and unlock requests go through configurable multi-level approval with full history.
Current strategic plan — One plan is marked current; work plans, progress and analytics work under it.
Lock — Submitting freezes a record for its approvers; final approval locks plans for good. Changes then need an approved unlock window.
Kenya fiscal year — 1 July – 30 June, written 2026/27; Q1 Jul–Sep, Q2 Oct–Dec, Q3 Jan–Mar, Q4 Apr–Jun.
Station — A reporting office: a county or an HQ department.
Glossary
Term
Meaning
AIE
Authority to Incur Expenditure — final approver of activity requests
ASAL
Arid and semi-arid lands; NDMA's 23 counties
CDC
County Drought Coordinator
Cascade
Generating HQ and county work plans from the approved national plan (an upsert)
DRIP
NDMA's investment-proposal system; proposals can be imported as investments
DRM
Drought risk management
GoK / Donor
Government of Kenya vs development-partner funding on a budget line
KRA
Key Result Area in the strategic plan
SO
Strategic Objective
SP Target
The strategic plan's yearly target as carried on the national work plan
Unlock window
A time-limited editing period on an approved plan, granted by an approved unlock request
UAT
User acceptance testing
Part B · User guide
2Getting started
Everything in this chapter applies to every user, whatever their permissions.
Sign in
Open KnowledgeWeb in Chrome or Edge and click Staff sign in (or go straight to /auth/login).
Enter your work email address and password, then click Sign In.
If two-factor authentication is on, enter the 6-digit code from your authenticator app (or one recovery code).
First sign-in with a temporary password? You are taken to Change Password and must set your own before anything else opens.
Sign in
Find your way around
The top bar holds the modules: Dashboard, Investments, Documents, Planning, Training, Approvals, Analytics, Reports, Knowledge AI and More (Admin, Data).
Hover or click a module to open its sub-menu; the strip under the top bar shows the pages of the module you are in.
You only see what your permissions allow. A page you cannot open shows Access refused instead of data.
The bell shows new notifications; the moon icon switches dark mode; your initials open the profile menu.
Find your way around
Secure your account
Profile menu > My Profile: update your position, phone and photo, then Save Changes.
Profile menu > Two-Factor Auth: Enable, scan the QR code with an authenticator app, Verify & Enable, and keep the recovery codes somewhere safe.
Profile menu > Passkeys: Add a passkey to sign in with Windows Hello, Touch ID or a security key.
Profile menu > Notification preferences: choose email and in-app per notification type, and a daily or weekly digest. Each switch saves immediately.
Secure your account
Notifications and email links
Approvals, returns, progress decisions, plan generation and announcements arrive in the bell and, if you allow it, by email.
Every email button opens the exact page where you act, for example the plan review page for an approver.
Notifications > Mark all read clears the badge; Preferences lets you switch individual types off.
Notifications and email links
When you are refused
A page you have no permission for shows Access refused with a link back to your dashboard, rather than an empty page. Ask your administrator for the permission named in the relevant chapter of this guide, then sign out and in again.
Access refused for a signed-in user without the permission
Part B · Investments
3Investments
At a glance
Investments
Record every drought-risk-management investment: what it is, where it runs, who funds and implements it, the results it promises, and how it is delivering. Approved investments are published to the public register and tracker.
Who uses it
Who
Does what
County Officer / HQ Planner
capture and submit
Approvers
decide
Publisher
publish
Everyone with view rights
browse, map, export
Key concepts
Category — Resilience, Response, Recovery or Other — the portfolio's top-level split, used as a filter and breakdown everywhere.
Micro or macro — Optional scale of the project, chosen on the form and offered as a filter on the public register and tracker. A record with no scale is in neither.
Identifiers — Code (issued by KnowledgeWeb, e.g. TUR-2026-0014, never reused), Serial no. (the source system's reference — mandatory and unique), Tender no. (the procurement reference, optional) and a share link for the public profile.
Results framework — Outputs → indicators (unit, baseline) → targets and achievements. Each indicator is reported Quarterly (per fiscal year, Q1–Q4) or for the Whole project (one target, one achievement). It drives the 'results progress' figure.
Partner investment — A project another stakeholder delivers. A record kind fixed at creation: reduced form, never submitted for approval, published straight from Draft, no results framework, attachments on the detail page.
Collaborator — A named colleague who may edit one investment and report its progress without holding investments.update.
How it flows
The screens
All Investments: status tabs, filters and the portfolio tableNew Investment: start with the essentials; every other section unlocks once createdInvestment detail with Report progress, PDF and ExcelMap View of published investments
How to
Create an investment
Investments > New Investment.
Enter the project name, Serial no. (mandatory and unique), Tender no. if it went to tender, Category (Resilience, Response, Recovery or Other), Micro or macro (optional), project manager, funding agreement, budget and currency, start and end dates.
Click Create investment. The other sections now unlock.
Work through the sections on the left: Coverage (county, sub-county, ward, county funds), Sectors, Financing (fund sources and amounts), Results framework (outputs and indicators — each indicator reported Quarterly, or once for the Whole project), Implementers, Beneficiaries, Field sites (GPS), Keywords and Attachments.
Submit for approval
On All Investments (or My Investments) click Submit for approval on the row.
Choose the approval process, add a comment and submit.
Track it under Approvals > My Submissions. Recall it there if no approver has acted yet; Resubmit after a return.
Record targets and achievements
Results framework: add an output, then an indicator; choose Quarterly or Whole project in the indicator row.
Quarterly: open the indicator's calendar, pick the fiscal year and enter a target and achievement for each of Q1–Q4. Whole project: enter one target and one achievement.
Switching an existing indicator asks first: quarters are added into one whole-project figure; going back to quarterly clears that figure so it can be entered by quarter.
Report progress after approval
Open the approved or published investment and click Report progress.
Update funds absorption %, achievement status, the stalled flag, beneficiaries reached, indicator achievements and lessons learnt.
Click Save progress. Targets, budgets and names cannot change once approved; documents and photos can still be added on the detail page.
Capture a partner investment
Investments > Partner Investment for a project another stakeholder delivers.
Complete Details, Coverage, Sectors, Financing, Implementers and Field sites, then save.
Partner records skip internal approval: a publisher publishes them from the Registry once at least one county is set. Attach agreements and reports on the detail page.
Publish to the public portal
Investments > Registry (HQ staff with investments.publish).
Click Publish on an approved record (or a partner draft). It appears on the public register and tracker.
Unpublish takes it off the portal again.
Other useful actions
Collaborators (detail page): let a colleague edit this one record and report its progress without wider rights.
Bulk import: download the template, fill it, Check the file, fix any rejected rows, then import. Choose 'Update existing where the serial matches' to update records.
PDF and Excel on the detail page export the investment profile; Map View plots every published field site.
Rules and behaviour
Four identifiers: Code (system, e.g. TUR-2026-0014), Serial no. (from the source; mandatory and unique), Tender no. (procurement, optional) and a public share link. Search finds any of the first three.
County officers see their own county's investments, plus records they created or collaborate on.
An NDMA investment is frozen from submission: a return or recall puts it back to draft. After approval only Report progress, documents and photos stay open. Only drafts can be deleted.
A single funder's amount cannot exceed the total budget, and county allocations together cannot exceed it.
On the public portal an investment's status is its stage: Complete, In progress, Scheduled or Stalled.
Permissions used
Permission key
Allows
Scopable
investments.view
View investments
Yes
investments.create
Create investments
Yes
investments.update
Edit investments
Yes
investments.manage-subresources
Manage counties/sectors/funders/outputs etc.
Yes
investments.delete
Delete investments
—
investments.publish
Publish investments to the public portal
—
Part B · Documents
4Resource Center
At a glance
Resource Center
Upload, classify, approve and publish NDMA's documents: drought early-warning bulletins, assessments, plans, policies and studies. Published items appear in the public Resource Library.
Who uses it
Who
Does what
Any staff with upload rights
upload and submit
Approvers
decide
Publisher
publish
Everyone
browse, preview, download
Key concepts
Document type — Decides the approval route (via the type's classification in Admin > Document Routing).
Bulletin — Decided by the document type (a type whose name contains 'bulletin'). County bulletin = one county; national bulletin = no county. Year and month place it on the bulletin matrix; a county bulletin also carries its Early Warning phase classification.
PDF only — Only PDFs are published. An Office file is converted in the Convert to PDF wizard (check, convert, preview, keep); the original is kept for staff.
Download protection — A profile (licence, footer, watermark, licence page, copy/print/edit restrictions) applied to the public copy of a published PDF. Profiles are recommended per classification or type in Admin > Download Protection; the original file is never changed.
Bibliographic fields — Author, publication year and abstract feed the public library's facets and year axis.
Staff access — Grant colleagues View only or Contributor on one document.
Share link — A time-limited, download-capped link for someone outside NDMA; revocable.
How it flows
The screens
Upload a document: AI can read the file and fill the formResource centre: every document with status, type and quick previewDocument details with preview, download and external share linksDocument registry: publish approved documents to the portal
How to
Upload a document
Documents > Upload & Submit (or Upload to keep a draft), then Choose file (PDF, Word, Excel, PowerPoint, images or ZIP, up to 50 MB). A file already in the library is refused, whatever it is called.
With 'Read the file and fill this in' on, the AI suggests title, type, author, year and abstract; each filled field shows the quote it came from (Show me where). Switch it off to type everything yourself.
Complete title, Document type (it decides the approval workflow), sector, author, publication year and description, then upload.
Add Keywords and Staff access (View only or Contributor) on the next tabs.
File a drought bulletin
Choose a bulletin document type (for example County Drought Bulletin or National Drought Bulletin): the bulletin panel opens with year and month, and county for a county bulletin.
For a county bulletin record the Early Warning phase classification: the county's phase and trend and each livelihood zone's (AI can read the table from the PDF).
HQ information officers file a month's county editions at once under Documents > Bulk County Bulletins: each county is read from its file name.
Bulletins appear on the public bulletins matrix (counties × months) and the Early Warning board once published.
Submit, approve and publish
Documents > My Documents > Submit for approval on the row (Upload & Submit does both at once).
Approvers preview and approve under Approvals > Pending Approvals.
Only PDFs are published. For a Word, Excel or PowerPoint file a publisher clicks Convert to PDF in the Registry: Check > Convert > Preview (page by page) > Keep. The original stays on the record for staff.
A publisher opens Documents > Registry and clicks Publish. The dialog opens on the download-protection profile recommended for the document's type (licence, footer, watermark, copy/print restrictions): publish with it, pick another or adjust it. Unpublish withdraws it.
Share with someone outside NDMA
Open the document > External share links.
Set days until expiry, maximum downloads and (optionally) the recipient's email; Create link and copy it.
Revoke the link at any time; it stops working immediately.
Find documents
All Documents: status tiles, search and sort; the eye icon opens a side preview.
Explorer: drill down classification > type > documents, with a breadcrumb to go back.
Knowledge AI > Semantic Search finds documents by meaning, not just words.
Rules and behaviour
Only your own drafts can be edited; submitted documents need documents.update; published documents cannot be deleted.
Internal documents are approved like any other but never published. Download protection applies to the public copy only; the original file is never changed.
County staff see their own county's tagged documents and every untagged one.
Confirmed public subscribers receive a daily round-up of newly published items (double opt-in).
Permissions used
Permission key
Allows
Scopable
documents.view
View documents
Yes
documents.create
Upload documents
Yes
documents.update
Edit document metadata
Yes
documents.delete
Delete documents
—
documents.publish
Publish documents to the public portal
—
documents.protection-settings
Set up download-protection profiles
—
documents.manage-folders
Manage document folders
Yes
documents.manage-access
Manage document sharing & access
Yes
documents.manage-keywords
Manage document keywords
Yes
documents.manage-subscriptions
Manage document-type subscriptions
Yes
Part B · Approvals
5Approvals
At a glance
Approvals
One approval engine for investments, documents, strategic plans, national/HQ/county work plans and plan-unlock requests. Records move level by level; any approver named on the current level can act.
Who uses it
Who
Does what
Submitters
submit, recall, resubmit
Approvers
approve, return, delegate
Tracking-report holders
monitor turnaround
Key concepts
Approval process — A named chain of levels (1, 2, 3 …), global or county-specific. Each level lists one or more approvers; any of them can act.
Approval record — One submission travelling through a process: status, current level, submitter, history.
Decisions — Approve or Return (with a comment). There is no reject: a record that should not go ahead is returned with the reason.
Delegation — An approver can hand a record to a colleague; history shows who acted.
SLA reminders — Overdue records remind their approvers and escalate to super administrators.
E-signature — A process can require approvers to sign when approving.
How it flows
The screens
Pending Approvals: records awaiting your decisionPlan review: read the whole plan, download Excel, then decideMy Submissions: track, recall and resubmit
How to
Decide on a record
Open Approvals > Pending Approvals (or click the button in the email).
Click the eye icon to view details, or Review plan for a strategic or work plan.
Approve (sign if the process requires an e-signature), or Return with a comment so the submitter can fix it. There is no Reject: a record that should not go ahead is returned with the reason.
Tick several rows to approve them at once when appropriate.
Delegate while away
On the record choose Delegate to a colleague and pick who.
The delegate can act at your level; history records who acted.
Follow your submissions
Approvals > My Submissions shows status and progress (level x of y).
Recall withdraws a submission before any approver has acted.
After a Return, edit the record and click Resubmit; it restarts at Level 1.
Monitor turnaround
Approvals > Tracking Report: filter by record type and status, open a record, export to Excel.
Overdue records trigger reminders to approvers and an escalation to administrators.
Rules and behaviour
Submitting a plan freezes it for everyone while approvers decide; a return or recall makes it editable again.
Final approval runs the module action: an investment or document becomes approved (publish-ready); a plan becomes locked.
Permissions used
Permission key
Allows
Scopable
approvals.processes.view
View approval process configuration
—
approvals.processes.manage
Configure approval processes/levels/approvers
—
approvals.records.submit
Submit a record for approval
—
approvals.records.view-tracking-report
View the approval tracking report
—
Part B · Planning > Strategic Plans
6Strategic Planning
At a glance
Strategic Planning
Build the multi-year strategic plan as a hierarchy, from strategic issues down to performance indicators with yearly targets and budgets. The approved, current plan is the yardstick every work plan and progress figure is measured against.
Yearly targets — Each indicator's target per plan year. A year is 'planned' only where a target exists — a blank or dash means not planned.
Aggregation — Sum (default) or Last value for cumulative indicators; percentages are always read as last value.
Current plan — Exactly one plan is current; work plans and progress pages work under it.
Lock and unlock — Pending approval freezes the plan; final approval locks it for good. A plan unlock request, itself approved, opens a time-limited editing window.
SO Mappings — Which departments deliver which strategic objective — this decides what each HQ department sees in the HQ plan.
Progress roles — Per mapping: Primary (one per department per plan), Also submits, or View only. A department captures and submits HQ progress only for its primary and allowed objectives.
How it flows
The screens
Strategic Plans list with status, approval and quick actionsPlan tree: Issue > Goal > KRA > Outcome > Objective > Strategy > Activity > Output > IndicatorSO Mappings: link each strategic objective to its departmentsStrategic Plan Scorecard: every indicator year by year
How to
Create and build a plan
Planning > Strategic Plans > New Plan: name, start and end year; save. Upload the signed plan document on the Documents tab.
Open the Tree view and add the hierarchy: Add Issue, then Goal, Key Result Area, Outcome, Strategic Objective, Strategy, Activity, Output and Indicator.
Open an indicator to set its baseline, whether it is a Percentage indicator, and Aggregation (Sum, or Last value for cumulative indicators), then enter yearly targets and budgets in its side panel. Planning has no unit of measure.
For bulk work use Matrix (paste, fill down, Save All) or Import from Excel (Template > Upload > Validate > Commit).
Map objectives and make it current
SO Mappings: tick the departments that deliver each strategic objective (each tick saves). A department's first objective becomes its primary.
Progress submission (same page): for each department choose its primary objective and tick under Also submits any other objective it may submit. The rest are view only (★ primary · ✓ also submits · ○ view only).
More > Set as current. Work plans and progress pages work under the current plan.
Approve, lock and revise
More > Submit for approval and choose the process. The plan is read-only while it is pending.
Final approval locks the plan permanently.
To change a locked plan, Request to reopen: an approved, time-limited editing window.
Rules and behaviour
There is no unlock button: approval is the lock, and reopening needs its own approval.
Strategic plans and national/HQ plans are for HQ staff only.
There is no cloning: each strategic plan is drawn up new.
Changing SO mappings and progress roles needs strategicplanning.update; they stay editable on an approved plan.
Permissions used
Permission key
Allows
Scopable
strategicplanning.view
View strategic plans
—
strategicplanning.create
Create strategic plans
—
strategicplanning.update
Edit strategic plans
—
strategicplanning.manage-lifecycle
Lock/import/auto-number plans
—
strategicplanning.delete
Delete strategic plans
—
strategicplanning.request-unlock
Request reopening of a locked plan
—
Part B · Planning > Work Plans
7Work Plans
At a glance
Work Plans
Turn the strategic plan into the year's national work plan, then cascade it to one HQ plan and a plan for each county. Each tier sets quarterly targets, budgets (GoK and donor), budget lines and responsible offices.
Who uses it
Who
Does what
HQ Planner
national plan and cascade
HQ departments
their objectives in the HQ plan
County officers
their county plan
Approvers
approve each tier
Key concepts
Tiers — One national plan per fiscal year, one HQ plan and one plan per county, all derived from the national plan.
SP Target — The national plan's annual target, taken from the strategic plan's yearly target and never edited on the work plan.
Budget line rows — Each indicator carries one or more funding rows (*IndicatorFundSource): budget line, office, GoK and donor amounts, Q1–Q4 targets and plan notes.
Cascade — An upsert from national to HQ / counties. It updates what changed, keeps entered figures, and reports rows that no longer qualify instead of deleting them.
Local wording — HQ/county may rephrase an activity; outputs and indicators keep the national wording, and analytics group by the national text.
Who changes a county plan — Only staff placed in that county. HQ staff and administrators read it.
Indicator notes — Append-only commentary per indicator; read-only while the plan awaits approval and once it is approved (an unlock window reopens them).
Budget notes — On the national plan, one note per budget line on how its money is spent; shown read-only on the matching HQ and county lines.
How it flows
The screens
National Work Plan with Cascade to HQ and Cascade to countiesCascade to counties: choose counties, review, doneCounty work plan grouped by strategic objectiveHQ plan: a department sees only the objectives mapped to it
How to
Create and populate the national plan
Planning > Work Plans > National > New work plan; choose the fiscal year (the current strategic plan is filled in); Create.
Run the populate wizard: Scope > Select activities and indicators > Review > Done. The SP Target comes from the strategic plan and cannot be edited here.
Edit (Grid): enter Q1–Q4 targets, GoK and donor amounts, budget line and office; Save All. Or use Edit in Excel to download, edit offline, upload and review every change before saving.
Approve and cascade
Submit for approval; the approvers review the plan on its review page and approve.
Once approved, Cascade to HQ (Review > Confirm > Done) and Cascade to counties (select counties > Review > Done).
Re-running a cascade updates what changed and never overwrites figures that were already entered.
Complete an HQ or county plan
Open your plan from Work Plans > HQ or County. The county list opens on the current fiscal year (Fiscal year filter; clear it for every year); county staff see only their own county.
Enter quarterly targets and the annual target in Edit (Grid) or with Edit in Excel. National plan opens the parent plan for reference.
Use the rephrase icon to put an activity in local wording without breaking the link to the national row. A county can also remove or add indicators from this year's national plan.
Submit for approval. An approved plan is locked; progress is then reported under Progress Reporting.
Reopen a locked plan
On the lock banner click Request to reopen: give the reason, choose the approval process and the window in days.
When approved, edit what is needed, then click Finish & re-lock.
Planning > Work Plans > Unlock Requests lists every request with a change report of what was touched.
Rules and behaviour
Only staff placed in a county change its plan. HQ staff and administrators open county plans view only.
Indicator notes follow the plan's lock: read-only while it awaits approval and once approved. The national plan's Budget notes explain how each budget line's money is spent and show read-only at HQ and county.
Budget lines on the national plan come from Master Data > Budget Lines; a line carried over from last year is marked Balance b/f.
Excel uploads are all or nothing: text in a number cell, a changed SP target or a file older than the latest edit is refused.
Permissions used
Permission key
Allows
Scopable
workplans.view
View national/HQ/county work plans
Yes
workplans.create
Create work plans
Yes
workplans.update
Edit work plans, activities & indicators
Yes
workplans.manage-lifecycle
Submit/approve/generate HQ & county plans
Yes
workplans.submit-progress
Submit quarterly progress
Yes
workplans.review-progress
Review submitted progress
Yes
workplans.submit-feedback
Submit quarterly feedback
Yes
workplans.delete
Delete national work plans
—
workplans.request-unlock
Request reopening of a locked work plan
Yes
workplans.progress-insights
View progress insights & reports
Yes
Part B · Planning > Progress Reporting
8Progress Reporting
At a glance
Progress Reporting
Each quarter, HQ departments and counties record what was achieved against their approved plan, attach evidence and submit it. HQ reviewers accept it or return it with reasons; accepted figures feed every dashboard and report.
Who uses it
Who
Does what
HQ departments and counties
capture and submit
Progress reviewers (HQ)
accept or return
Analysts
analyse
Key concepts
Scope of a submission — HQ submits per strategic objective (only the departments with that objective as primary or allowed); a county submits its whole plan, per quarter, with three required documents.
Deadline — The 5th of the month after the quarter. After it, a first submission needs a late-submission request granted by a reviewer.
States — Not submitted → Submitted → Accepted, or Returned (with reasons and row flags) → Resubmitted.
Two kinds of comment — Plan notes (set while planning) and progress comments (written with each achievement). Reviewers see both.
Evidence — Supporting documents attached to a submission, fixed while it is submitted.
Station — A reporting office — a county or an HQ department.
The reporting calendar
Quarter
Months
Progress due
Q1
July – September
5 October
Q2
October – December
5 January
Q3
January – March
5 April
Q4
April – June
5 July
The screens
Progress hub: your plan with four quarter tilesCapture one quarter: target beside achievement, % of target, commentReview queue: oldest first, overdue highlightedReview a submission: figures, comments, evidence, history, then Accept or Return
How to
Capture a quarter
Planning > Progress Reporting > Capture Progress; on your plan card click Report Q#.
For each indicator enter the achievement and a comment. Percentages must be 0–100 and nothing may be negative. A line with a target for the quarter, or an achievement different from its target, needs a progress comment.
HQ: you capture only your department's primary objective and those it is allowed to submit; others show as view only.
Save. You are warned before leaving with unsaved edits.
Submit for review
Click Submit Q#. HQ submits per strategic objective; a county submits the whole plan.
Add a covering note and attach supporting documents. A county submission needs three: the partnership template, the investment template and the CCU minutes.
Confirm. At least one indicator needs a value; the rest are submitted as not reported. The quarter is frozen once submitted.
Review a submission (HQ reviewers)
Progress Reporting > Review Queue; open the submission.
Read figures against targets, the submitter's comments, plan notes, evidence and history.
Accept, or Return with a reason and flag the rows that need attention. Tick 'Open the next submission afterwards' to keep going.
Fix a returned quarter
Open the capture page; filter 'Flagged by reviewer' to see the flagged rows and the reason.
Correct the figures and Resubmit. Flags resolve automatically.
Rules and behaviour
Only approved plans and quarters that have started can be captured. Kenya fiscal year: Q1 Jul–Sep, Q2 Oct–Dec, Q3 Jan–Mar, Q4 Apr–Jun.
Progress is due on the 5th of the month after the quarter ends. Daily reminders run from 3 days before the quarter ends to the 5th; after the 5th a first submission needs a late-submission request, granted by a reviewer.
Reviewing is for HQ staff with workplans.review-progress; county staff report their own progress only.
Permissions used
Permission key
Allows
Scopable
workplans.view
View national/HQ/county work plans
Yes
workplans.create
Create work plans
Yes
workplans.update
Edit work plans, activities & indicators
Yes
workplans.manage-lifecycle
Submit/approve/generate HQ & county plans
Yes
workplans.submit-progress
Submit quarterly progress
Yes
workplans.review-progress
Review submitted progress
Yes
workplans.submit-feedback
Submit quarterly feedback
Yes
workplans.delete
Delete national work plans
—
workplans.request-unlock
Request reopening of a locked work plan
Yes
workplans.progress-insights
View progress insights & reports
Yes
Part B · Training
9Training (LMS)
At a glance
Training (LMS)
A built-in learning management system: courses with modules and materials, assessments, assignments with due dates, certificates with a public verification check, and feedback.
Who uses it
Who
Does what
Trainers
build, publish, assign, analyse
All staff
learn, take quizzes, earn certificates
Anyone
verify a certificate
Key concepts
Course — Category, level, minutes, CPD points, enrolment mode (open or assigned), certificate on completion.
Materials — Rich text, files (optionally downloadable), video URLs and links; each can be required for completion.
Assessment — Pass mark, gating, retake wait; questions written by hand or drafted by AI and approved by the trainer.
Certificate — Issued on completion, downloadable as PDF and verifiable publicly by its number.
The screens
Catalogue: search, filter and enrolCourse player: materials, progress and bookmarksCourse builder: curriculum, assessment, enrolments, feedbackMy Learning: courses in progress and completed
How to
Take a course
Training > Catalogue: search or filter, open Details, click Enroll.
In the player open each material and click Mark complete, then Next. Bookmark anything to come back to.
Take the assessment when offered. If you fail, wait the stated time and retake.
Training > My Certificates > Download PDF once complete. Leave feedback on the course page.
Build and publish a course (trainers)
Training > Manage > Courses > New Course: title, summary, category, level, minutes, CPD points, enrolment, certificate.
Curriculum > Add Module, then + Material: rich text, file, video URL or link; mark what is required.
Assessment: set the pass mark and retake wait, add questions (or Draft with AI, then approve the verified ones) and switch it on.
Publish, then Enrollments > Assign Learners with a due date.
Rules and behaviour
A course can be published only with content; it can be deleted only while it is a draft with no enrolments.
Certificates can be verified on the public site at /public/verify-certificate.
Permissions used
Permission key
Allows
Scopable
training.manage
Manage training content
—
Part B · Analytics, Reports
10Analytics & Reports
At a glance
Analytics & Reports
Live dashboards for leadership, planners and analysts, and branded PDF and Excel reports that can also be scheduled for email delivery. Work-plan figures come only from submitted or accepted quarters of the current strategic plan.
Who uses it
Who
Does what
Managers
executive and module dashboards
Analysts and reviewers
progress dashboards, explorer, delivery reports
Everyone
My Workbench
Key concepts
Single source of truth — Work-plan delivery figures come from Progress Insights: submitted or accepted quarters of the current strategic plan only.
Performance — The mean of capped achievement ÷ target ratios. One vocabulary everywhere: Above target, On target, Below target (rounded to the whole per cent).
Scheduled reports — Run as their owner, reach only active KnowledgeWeb users, and pause with a reason if the owner loses access.
The screens
Executive dashboardPlanning Cycle: stations × quarters, plan quality, deadlinesProgress AnalysisReport catalogue: generate PDF or Excel
How to
Read the dashboards
Dashboard > Executive for the headline figures; Dashboard > My Workbench for your own pending items. Planning > Overview shows how the year's delivery is going through your own lens.
Analytics > Planning & Progress: Planning Cycle, Plan Budget, Strategic Plan Scorecard, Progress Analysis, Progress Explorer and My Station Scorecard. Planning > Progress Tracking: Progress Tracker, County Summary, Feedback & Comments.
Analytics > Investments: Investment Analytics and Investment Tracker. Operations: Activity Requests and Resources.
Filters (fiscal year, quarter or year to date, counties/HQ, station, objective) apply to every panel on the page.
Generate a report
Reports > Report Catalogue lists the reports you are allowed to run.
Click Generate, choose the parameters and format (PDF or Excel).
Reports > Report History re-downloads anything generated before. Progress Reports offers the delivery reports in one place.
Schedule a report
Reports > Scheduled Reports > New Schedule: report, format, frequency and recipients.
Recipients must be active KnowledgeWeb users. The report runs as you and contains only what you can see.
Rules and behaviour
A 'station' is a reporting office: a county or an HQ department.
Progress is described in three bands only: Above target, On target, Below target (achievement ÷ target, rounded to the whole per cent).
Delivery figures are shown to HQ progress analysts only; others see plan structure.
Permissions used
Permission key
Allows
Scopable
dashboards.view-executive
View executive dashboard
—
dashboards.view-investments
View investment analytics
Yes
dashboards.view-planning
View planning analytics
Yes
dashboards.view-activities
View activity analytics
Yes
dashboards.view-resources
View resource analytics
Yes
dashboards.view-tracker
View investment tracker map
Yes
dashboards.view-admin
View system health dashboard
—
Part B · Knowledge AI
11Knowledge AI
At a glance
Knowledge AI
Ask questions in plain English (or Swahili) about NDMA's published documents and investments. Every answer cites its sources. The same engine powers document auto-fill and investment drafting.
Who uses it
Who
Does what
Staff with ai.use
chat and semantic search
Key concepts
Retrieval — Answers are grounded in the published documents and investments indexed for search, with citations.
Auto-fill — Document upload and investment drafting reuse the same engine and show the evidence quote for each field.
The screens
Knowledge Assistant: answers cite their source records
How to
Ask the assistant
Knowledge AI > Chat; type a question or pick a suggestion.
Open a citation card to go to the source record. Conversations keeps your history.
Semantic Search returns the closest documents and investments by meaning.
Rules and behaviour
AI suggestions are drafts. Always check them against the source before saving.
Permissions used
Permission key
Allows
Scopable
ai.use
Use AI search, chat & summarization
—
Part B · Public site (no sign-in)
12Public Portal
At a glance
Public Portal
The open atlas of Kenya's drought resilience work: published investments, the funds tracker, the Resource Library and bulletins, search, and email subscriptions. No sign-in is needed.
Who uses it
Who
Does what
Citizens, partners, media
browse, search, download, subscribe
Key concepts
What is public — Approved/published investments and published documents only — called resources on the portal.
Partners — Funding and implementing partners are listed A–Z; the portal never ranks or compares them.
Subscriptions — Double opt-in; a daily round-up of what was published since each subscriber's own last email; one-click unsubscribe.
The screens
Public home: the open atlasInvestment registerResource LibraryBulletin record: counties × months
How to
Use the portal
Home: search everything, or explore by category and county.
Investments: filter by county, sector, partner, category, status and micro or macro; open a profile for its map, delivery and PDF/Excel.
Tracker: the live funds and delivery survey, with the same filters. Resources: browse, list, gallery or explorer views; Bulletins: the counties × months record; Early Warning: each county's drought phase month by month.
Subscribe: choose topics and a county; confirm from the email to start receiving the daily round-up.
Rules and behaviour
Only approved and published records appear. Unpublishing in the Registry removes them.
The portal names its partners (those who fund and those who implement) in an A–Z list; it never ranks or compares them.
Part B · Planning > Activity Requests
13Activity Requests
At a glance
Activity Requests
Plan field missions and activities: purpose, budget, team, itinerary and travel; parallel Finance, HR and M&E checks; final AIE approval; data collection and sign-off afterwards.
Who uses it
Who
Does what
Requesters
create and submit
Finance / HR / M&E checkers
review in parallel
AIE holders
final approval
Key concepts
Review streams — Finance, HR and M&E checks run in parallel; AIE approval follows when all three have approved.
How to
Raise and track a request
Planning > Activity Requests > New Request: details, funds and logistics, budget lines, team, itinerary and travel; save and Submit.
Checkers act from Pending Reviews; the AIE holder approves once Finance, HR and M&E have approved.
After the activity, complete the data collection forms and sign off under Sign-Offs.
Rules and behaviour
Not part of this week's UAT scope; available for familiarisation.
Permissions used
Permission key
Allows
Scopable
activityrequests.view
View activity requests
—
activityrequests.create
Create activity requests
—
activityrequests.update
Edit activity requests
—
activityrequests.delete
Delete draft activity requests
—
activityrequests.manage-mailinglists
Manage M&E mailing lists
—
activityrequests.finance.allocate
Allocate funds (Finance)
—
activityrequests.finance.approve
Approve finance check
—
activityrequests.hr.allocate
Allocate logistics (HR)
—
activityrequests.hr.approve
Approve HR check
—
activityrequests.mecheck.approve
Approve M&E check
—
activityrequests.aie.approve
Final AIE approval
—
activityrequests.aie.reject
Reject activity request
—
Part B · Approvals
14Approvals in depth: plan review
Strategic plans, national/HQ/county work plans and plan-unlock requests open on a read-only plan review page (/approvals/{id}/plan) rather than a summary. The approver sees the whole plan — every objective and indicator, with targets and budgets — can download it to Excel and read indicator notes, and approves or returns from the same page.
Plan review: the approver reads the full plan before deciding
Who may open it is decided by the approval record (submitter, any approver on the process, a delegate, anyone who acted, or a superadmin) — not by planning permissions.
An HQ approver sees the whole plan here, not only their own department's objectives.
Every approval email links straight to this page for plan records, and to Pending Approvals for everything else.
Approval Tracking Report with turnaround and status filters
Part B · Planning
15Locks, unlock windows and the change report
Plan state
Planned figures
Achievements
Notes
Draft / returned
Editable
—
Editable
Awaiting approval
Frozen for everyone
Frozen
Read-only
Approved (locked)
Frozen
Captured in Progress Reporting
Read-only
Approved + unlock window open
Editable until the window closes or expires
Progress Reporting
Editable
Approval is the lock: IsLocked is never cleared. An unlock request (itself approved) opens a window; closing it is one click (Finish & re-lock) and expiry needs no job to run.
Only one request may be open or pending per plan at a time; a plan open for editing cannot be re-submitted for approval.
The change report lists what was touched while the window was open and by whom (from record timestamps, not before/after values).
Reopening a plan keeps a version before and after. Re-locking a national plan that changed pushes the changes into the existing HQ and county plans and tells their staff what changed.
Planning > Work Plans > Unlock Requests
Editing a plan in Excel
Edit in Excel (national, HQ and county) downloads the plan grouped by its strategic-plan hierarchy, with hidden keys and a version stamp per row.
Upload previews every change; nothing is written until you save, and then everything is saved or nothing is.
Refused: rows from another plan, moved columns, text in number cells, negative numbers, percentages outside 0–100, unknown budget lines, a changed SP Target, and any row changed in the app since the file was downloaded.
Warnings you acknowledge: quarters that do not add up to the annual target, money without a budget line.
Part C · Administration
16Administration guide
More > Admin
Running the platform
Everything an administrator needs: users and permissions, master data, approval processes and document routing, audit trail, logins and sessions, settings, subscribers, exchange rates, announcements, data import/export, DRIP and legacy migration.
Administration control panel
Set-up checklist (in order)
1. Configure the server
ICT sets App:BaseUrl (the address used in every email link), the SMTP account, and optionally the AI key. These are server settings, not pages; see the Technical section.
2. Load master data
Admin > Master Data: check Counties (with GPS and contact emails), Sub-Counties, Wards, Directorates, Departments, Pillars, Priority Action Areas, Sectors, Fund Sources, Stakeholder Organisations, Funding Agreements, Budget Lines, Document types and Early Warning (livelihood zones and trends). Pick a category on the left, then Add New, edit or deactivate.
Load master data
3. Create user accounts
Admin > Users > New user: names, email, position, department, county and line manager, a Starting Permission Template and a temporary password. The user must change it at first sign-in.
Create user accounts
4. Set placement correctly
A person's County decides what they reach: no county, or the county named HQ, makes them HQ staff; any other county makes them county staff, confined to that county.
5. Grant permissions
Users > Manage permissions (or Admin > Permissions Matrix): tick capabilities per module and choose a scope (Global, Own County, Own Department or a specific unit), then Save Changes. The user signs out and in again to pick up changes.
Grant permissions
6. Build approval processes
Admin > Approvals > New Process: name it, Add Level 1, 2… and choose the approvers for each level (any one can act). Optionally require an e-signature.
Build approval processes
7. Route documents
Admin > Document Routing: link each document classification to the approval process its documents should follow.
8. Prepare planning
On the strategic plan: map each strategic objective to the departments that deliver it (SO Mappings), then under Progress submission choose each department's primary objective and tick any others it may also submit. Mark the plan current (More > Set as current). HQ department staff see nothing until objectives are mapped, and submit progress only for their primary and allowed objectives.
Prepare planning
9. Set up download protection
Admin > Download Protection (needs documents.protection-settings): create the protection profiles (or the three starter profiles) and recommend one for each document classification or type. Publishers then publish with the recommended profile in one click. Install LibreOffice on the server so Office files can be converted to PDF.
10. Grant reviewer and analyst rights
Give workplans.review-progress to the HQ M&E reviewers, workplans.progress-insights to analysts, documents.protection-settings to whoever sets up download protection, and investments.publish / documents.publish to the HQ publishers. None is granted to anyone by default.
11. Announce go-live
Admin > Overview > Announcements: title, message and an optional link; Send (click twice to confirm). It reaches every active user in-app and by email.
Announce go-live
The access model
A grant is the presence of a permission for a person, with a scope: Global, Own County, Own Department, Specific County or Specific Department.
Own County / Own Department follow the person's profile, so a grant moves with them when their county changes.
system.superadmin bypasses every check. Use it for set-up and support only.
Two capabilities are granted to nobody by default and must be given deliberately: workplans.review-progress and workplans.progress-insights.
Some rights are not permissions at all: approvers are named on approval levels; activity-request owners act on their own requests; investment collaborators are named per record.
Permission templates
Template
Purpose
Standard Staff
Default access matching what all staff could do before the matrix
County Staff
Standard Staff scoped to the person's own county for data-heavy modules
AIE Holder
Standard Staff plus final activity-request approval
Finance / HR / M&E Checker
Standard Staff plus the matching activity-request review stream
Knowledge Management Champion
Standard Staff plus training content management
External Partner
A narrow, view-only starting point for external accounts
Administrator (Super Admin)
Full access; the baseline is granted alongside superadmin
All-users permissions matrix
Users
Admin > Users: search and filter Active / Inactive.
Edit to change details; Reset password issues a temporary one; Deactivate stops sign-in and revokes sessions.
Manage permissions: tick capabilities, choose scope, Save Changes. Super Administrator is a separate switch.
Deactivating a user stops sign-in and revokes their refresh tokens; the account stays in the Inactive list.
Reset password issues a policy-compliant temporary password and forces a change at next sign-in.
Password policy: at least 8 characters with upper case, lower case, a number and a symbol; the last 5 passwords cannot be reused; 5 failures lock the account for 15 minutes.
Approval processes and document routing
Admin > Approvals > New Process: name, description, optional county (blank = global).
Add Level 1, 2 … and pick one or more approvers per level; optionally require an e-signature.
Admin > Document Routing: map each document classification to a process.
Planning, investment and document submitters choose the process when they submit.
Master data
Reference lists used across modules, grouped on the left of Admin > Master Data: Geography (counties with GPS and finance/procurement emails, sub-counties, wards), Organisation (directorates, departments), Sectors & Themes (pillars, sectors, themes), Funding (funding source types, fund sources, funding agreements, budget lines), Partners (stakeholder organisations, beneficiaries) and Documents (classifications, categories, types). Parents are chosen from dropdowns; deactivating keeps history intact.
Monitoring and security
Audit Trail: filter by user, entity and date; Details shows before and after values.
Logins: every sign-in attempt. Sessions: who is signed in; Terminate signs a session out within about 30 seconds.
Analytics > System Health: sign-ins, failures and recent audit events.
Audit Trail with filters and before/after details
Other administration pages
Page
Purpose
Settings
Key/value application settings (none are seeded)
Exchange Rates
KES rates for other currencies used in investment budgets
Subscribers
Read-only list of public subscribers, their topics and last round-up; people leave only via their own unsubscribe link
Announcements
Send an in-app + email notice to all active staff
Data > Import / Export / Import History
Template-driven bulk import with row-level errors; export of key lists to Excel, CSV or PDF
DRIP Integration
Connection to the DRIP proposal system for importing investments
Legacy Migration
Idempotent, logged migration of KMSLive data, domain by domain
Analytics > System Health
Sign-ins, failures, users by placement and recent audit events
Create three starter profiles, or New profile: licence and holder, footer, watermark, licence page, and copy/print/edit restrictions. One profile is the default.
Recommended for: pick a profile per document classification or type; a type without its own follows its classification, then the default.
The page also shows whether the PDF converter (LibreOffice) is ready on the server.
Data > Import with template download
Part D · Technical
17System requirements
Users' devices
Item
Requirement
Browser
Current Microsoft Edge or Google Chrome (Firefox and Safari work; the training pack is tested on Edge/Chrome)
Screen
1366 × 768 or larger recommended; layouts adapt to tablets and phones
Connection
Stable broadband; the staff application keeps a live connection (WebSockets) to the server
Passkeys
Windows Hello, Touch ID, Android biometrics or a FIDO2 security key
Two-factor
Any TOTP authenticator app (Microsoft or Google Authenticator, Authy …)
Office files
Excel for the planning and import round-trips; previews open in the browser
Server
Component
Requirement
Operating system
Windows Server 2019/2022 with IIS 10 (production today), or any OS running Kestrel behind a reverse proxy
Runtime
.NET 10 ASP.NET Core Hosting Bundle (framework-dependent, win-x64)
IIS features
WebSocket Protocol enabled (Blazor Server); Web Deploy for publishing
Database
SQL Server 2019/2022, a dedicated SQL login (not sa), encrypted connections
Memory / CPU
Minimum 4 vCPU, 8 GB RAM for the application; size SQL Server separately
Storage
Space for uploads under the configured storage path (documents, attachments, covers), outside the web root, backed up with the database
TLS
A valid certificate for the public host name; HTTPS only (HSTS)
Knowledge AI chat and search, document auto-fill, investment and quiz drafting, narratives
Optional
Qdrant vector database
Semantic search and AI answers over documents and investments
Optional
DRIP
Importing investment proposals
Optional
Map tiles (OpenStreetMap / CARTO)
Investment maps in the browser
Yes (internet access from browsers)
Part D · Technical
18Installation and configuration
Deployment
Provision SQL Server and create an empty database and a dedicated login with db_owner on it.
Install the .NET 10 Hosting Bundle on the web server, enable WebSockets, create the IIS site and HTTPS binding.
Set configuration (below) through environment variables or appsettings.Production.json — never commit secrets.
Publish from the solution with the Production profile (Release, win-x64, EnvironmentName=Production) using Web Deploy, or copy a `dotnet publish` output.
Apply database migrations (dotnet ef database update, or run the generated idempotent script).
Start the site. On first start the application seeds the permission catalog, templates and reference data, and creates the initial administrator account.
Sign in as the initial administrator, change the password, then follow the administrator set-up checklist.
Configuration keys
Key
Purpose
App:BaseUrl
Public address used in every email link, share link and certificate link — production: https://kms.fabtechcloud.com
Office-to-PDF conversion for publishing; LibreOffice must be installed on the server (or a Gotenberg URL set)
PublicSubscriptions:Enabled
Daily subscriber round-up (08:00 UTC)
Thumbnails:Enabled
Rendering of document cover images
Any key can be set as an environment variable with __ in place of :, e.g. App__BaseUrl.
Background services
Service
What it does
When
Email sender
Sends queued email with retries
Continuous
Approval SLA reminders
Reminds approvers of overdue records; escalates to super administrators
Periodic
Progress reminders
Daily reminders to stations that have not submitted, from 3 days before the quarter ends to the 5th; the last copies the reviewers
Daily 06:00 UTC
Plan re-lock finaliser
When an unlock window ends, records the after-version and cascades national changes
Every 5 min
PDF converter warm-up
Prepares LibreOffice shortly after start so the first conversion is quick
Once at start
Scheduled reports
Generates and emails scheduled reports as their owner
Hourly check
Subscriber round-up
Emails confirmed public subscribers what was published since their last email
Daily 08:00 UTC
Notification digests
Daily / weekly digest of unread notifications
07:00 UTC; weekly on Monday
Training reminders
Due and overdue course assignments
Periodic
Document covers
Renders a cover image for PDF documents
Periodic
AI embeddings
Indexes newly published documents and investments for search
Every 60 s (if enabled)
Operations
Logs — Serilog writes structured logs to the console and rolling files under logs/ in the application folder.
Health — /health and /alive are mapped in Development only; in production monitor the site URL and the logs.
API documentation — Swagger UI (/swagger) is enabled in Development; the REST API lives under /api/v1 with JWT bearer authentication.
Backups — Back up the SQL database and the uploads folder together. Documents store the absolute path of their file, so restore files to the same path (or update the paths) when moving servers.
Rate limits — Global 100 requests/min per IP; sign-in endpoints 10 per 5 min; API 50/min per user.
Part D · Technical
19Architecture and security
Technology stack
Layer
Technology
Runtime / UI
.NET 10, Blazor Server, MudBlazor 9
API
ASP.NET Core controllers (/api/v1), Swashbuckle, FluentValidation
Data
Entity Framework Core 10 on SQL Server; one AppDbContext; soft delete and audit stamps on every entity
Plans the HQ entries of the objectives mapped to their department; captures and submits progress for the department's primary objective and any others the administrator allows.
workplans.view/update/submit-progress
Planning, Progress
County Officer (CDC)
County investments, bulletins, county work plan and quarterly progress, scoped to own county. Only county staff change their county's plan.
Planning Cycle · Plan Budget · Strategic Plan Scorecard · Progress Analysis · Progress Explorer · My Station Scorecard · Investment Analytics · Tracker · Activities · Resources · System Health