DESILTING, REHABILITATION AND SOLARIZATION OF FARYAR WATER PAN – GARISSA COUNTY

In progress Garissa 30 Sep 2025 – 14 Jan 2026 CDC Ref № 1098
Committed KSh 9.8M
Delivered 0%
Funds absorbed 100%
County Garissa

About this investment 01 · Record


The National Drought Management Authority implemented the desilting, rehabilitation and solarization of Faryar Water Pan under Contract Ref. No. NDMA/RT/13/2024-2025.

Delivery 02 · Progress


0%

0% delivered against planned delivery, with KSh 9.8M committed to this investment.
Status In progress Under way — started, and not yet complete.

Funds absorption 100%

Results & achievements 03 · Delivery record


What this investment set out to deliver — and how far each measure has come. Overall, 0% of the planned results have been achieved.

Output 1 · Approximately 17,603 m³ of silt removed from the main water pan.

0%
Silt removed from the main water panm³
0 / 0
Excavation and removal of approximately 17,603 m³ of silt.m³
0 / 0

Output 2 · Silt trap constructed to approximately 3 m final depth.

0%
Silt trap final depthm
0 / 0
Excavation of a silt trap to a final depth of approximately 3 m.m
0 / 0

Output 3 · 30 gabion boxes installed for erosion protection.

0%
Gabion boxes installedboxes
0 / 0
Installation of 30 gabion boxes measuring approximately 2 m x 1 m x 1 m.boxes
0 / 0

Output 4 · Rip-rap protection works completed at critical inlet and outlet areas.

0%
Rip-rap protection works completed at critical inlet and outlet areas
0 / 0

Output 5 · Solar-powered boost pump and six 335 W solar modules installed.

0%
Solar-powered boost pump installed
0 / 0
Installation of one surface solar-powered boost pump with approximate capacity of 20 m³/hr and 6–15 m head.
0 / 0
Solar modules installedW
0 / 0
Installation of six 335 W monocrystalline solar modules.W
0 / 0

Output 6 · 10,000-litre water storage tank and associated pipeline/standpipe installed.

0%
Water storage tank installedlitre
0 / 0
Installation of a 10,000-litre water storage tank and tank stand.litre
0 / 0

Output 7 · Animal water trough constructed.

0%
Animal water trough constructed
0 / 0
Construction of a masonry animal water trough including foundation, reinforced concrete slab, stone walling and finishes.
0 / 0

Output 8 · Fabricated structural steel pontoon installed.

0%
Fabricated structural steel pontoon installed
0 / 0
Installation of a fabricated structural steel pontoon complete with platform and pump brackets.
0 / 0

Output 9 · Solar installation area fenced and gated.

0%
Solar installation area fenced and gated
0 / 0
Construction of fencing and gates around the solar installation area.
0 / 0

Locations 04 · Survey


1 site(s) surveyed for this investment

Faryar
0.0524, 40.3086

Partners & funding 05 · Parties


Funding partners

European Union

Implementing partners

NDMACounty Government

Beneficiaries

HouseholdsPastoralist householdsAgro-pastoralists

Keywords 06 · Index


Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please reload the page.