The National Drought Management Authority implemented the desilting, rehabilitation and solarization of Faryar Water Pan under Contract Ref. No. NDMA/RT/13/2024-2025.
Delivery 02 · Progress
0%
0% delivered against planned delivery,
with KSh 9.8M committed to this investment.
Status
In progress
Under way — started, and not yet complete.
Funds absorption100%
Results & achievements 03 · Delivery record
What this investment set out to deliver — and how far each measure has come.
Overall, 0% of the planned results have been achieved.
Output 1 · Approximately 17,603 m³ of silt removed from the main water pan.
0%
Silt removed from the main water panm³
0 / 0
Excavation and removal of approximately 17,603 m³ of silt.m³
0 / 0
Output 2 · Silt trap constructed to approximately 3 m final depth.
0%
Silt trap final depthm
0 / 0
Excavation of a silt trap to a final depth of approximately 3 m.m
0 / 0
Output 3 · 30 gabion boxes installed for erosion protection.
0%
Gabion boxes installedboxes
0 / 0
Installation of 30 gabion boxes measuring approximately 2 m x 1 m x 1 m.boxes
0 / 0
Output 4 · Rip-rap protection works completed at critical inlet and outlet areas.
0%
Rip-rap protection works completed at critical inlet and outlet areas
0 / 0
Output 5 · Solar-powered boost pump and six 335 W solar modules installed.
0%
Solar-powered boost pump installed
0 / 0
Installation of one surface solar-powered boost pump with approximate capacity of 20 m³/hr and 6–15 m head.
0 / 0
Solar modules installedW
0 / 0
Installation of six 335 W monocrystalline solar modules.W
0 / 0
Output 6 · 10,000-litre water storage tank and associated pipeline/standpipe installed.
0%
Water storage tank installedlitre
0 / 0
Installation of a 10,000-litre water storage tank and tank stand.litre
0 / 0
Output 7 · Animal water trough constructed.
0%
Animal water trough constructed
0 / 0
Construction of a masonry animal water trough including foundation, reinforced concrete slab, stone walling and finishes.