Skip to content
National Drought Management Authority · Open Data
National Drought Management Authority seal
KnowledgeWeb National Drought Management Authority

County profile

Garissa County

The drought early warning record, the monthly bulletins, the investments reaching Garissa and the resources about it — everything on NDMA's public record for the county, in one place.

Drought phase · October 2026 Normal Less severe than August 2026, when it was Alert.
Garissa County — 7 surveyed sites Tana Delta Irrigated Agriculture SchemeTana Delta Irrigated Agriculture SchemeTana Delta Irrigated Agriculture SchemeTana Delta Irrigated Agriculture SchemeTALEH GROUP FARM IRRIGATION INFRASTRUCTURE PROJECT – GARISSA COUNTYDESILTING, REHABILITATION AND SOLARIZATION OF FARYAR WATER PAN – GARISSA COUNTYREHABILITATION OF ALFARAH SCHEME LOCATED IN IFTIN WARD IN TOWNSHIP SUB COUNTY, GARISSA COUNTY
7 surveyed investment sites shaded by its Oct phase
Investments
7
published
Committed
KSh 707.0M
across them
Partners
9
funding & implementing
Bulletins
8 / 12
of the past 12 months had a bulletin
Resources
0
about Garissa
Sub-counties
7
31 wards

Drought early warning

The last 24 months in Garissa

Each month's county drought bulletin classifies the county, and each of its livelihood zones, into one of six phases. A gap is a month with no published bulletin.

Every county, month by month
  1. D
  2. J2025
  3. F
  4. M
  5. A
  6. M
  7. J
  8. J
  9. A
  10. S
  11. O
  12. N
  13. AtD
  14. AtJ2026
  15. AtF
  16. AtM
  17. A
  18. NM
  19. NJ
  20. J
  21. AtA
  22. S
  23. NO
  24. N
N Normal 3PA Pre-Alert 0At Alert 5Am Alarm 0E Emergency 0R Recovery 0 No bulletin 16

Latest classified bulletin · October 2026

Garissa County Drought Early Warning Bulletin — October 2026

Livelihood zones
ZonePhaseTrend
Agro-Pastoral Alert → Stable
Pastoral Alert ↘ Worsening
Formal Employment/ Casual labour Alert ↘ Worsening

Normal: Rainfall, pasture, water and food indicators are within their usual range for the season.

Read the bulletin

Food security assessment

Garissa's food security

The IPC acute food insecurity phase from the Long Rains (July) and Short Rains (February) assessments, and the number of people in each phase.

All assessment reports

No food security assessment report for Garissa is published yet.

The latest round on record is the Long Rains 2026 Assessment.

See the counties on the map

Investments

Drought-resilience work reaching Garissa

Every published investment with Garissa among its counties — budgets are each investment's whole budget, in Kenya shillings.

Full county analytics
7investments
KSh 707.0Mcommitted
42%average completion
87Kpeople reached of 94K

Where they stand

By sector

Where in Garissa

Most recent

WaterPartner-implemented In progress
Resilience

GAR-2026-0007

REHABILITATION OF ALFARAH SCHEME LOCATED IN IFTIN WARD IN TOWNSHIP SUB COUNTY, GARISSA COUNTY

The purpose of the project is to achieve environmentally sustainable approach and conservation of the natural resources so as to ensure the attainment and continued satisfaction of human needs for the present generation without compromising the needs of future generations.

KSh 25.0M committed View
Water In progress
Resilience

GAR-2026-0006

DESILTING, REHABILITATION AND SOLARIZATION OF FARYAR WATER PAN – GARISSA COUNTY

The National Drought Management Authority implemented the desilting, rehabilitation and solarization of Faryar Water Pan under Contract Ref. No. NDMA/RT/13/2024-2025.

KSh 9.8M committed View
Water Complete
Resilience

GAR-2026-0005

TALEH GROUP FARM IRRIGATION INFRASTRUCTURE PROJECT – GARISSA COUNTY

The Taleh Group Farm Irrigation Infrastructure Project, located in Gurufa Village, Sabena Ward, Lagdera Sub-County, Garissa County, was implemented by the National Drought Management Authority (NDMA) in collaboration with the County Government of Garissa and the local community.

KSh 14.3M committed View
Water In progress
Other

GAR-2026-0004

Rigdam Integrated Water Infrastructure Rehabilitation and Pipeline Extension project

Geographic Coverage Sectors Specific Objectives Outputs Beneficiaries Garissa Water Improved water access Rehabilitated water system Households: 800 Indicator Target Achievement INVESTMENT REPORT Rigdam Integrated Water Infrastructure Rehabilitation and Pipeline Ext

KSh 29.0M committed View
Water In progress
Other

GAR-2026-0003

Water Infrastructure Rehabilitation and Pipeline Extension project

Geographic Coverage Sectors Specific Objectives Outputs Beneficiaries Garissa Water Improved water access Rehabilitated water system Households: 800

KSh 29.0M committed View
Agriculture & Food Security In progress
Other

GAR-2026-0002

Tana Delta Irrigated Agriculture Scheme

Smallholder irrigation and drought-tolerant seed along the Tana river system.

KSh 300.0M committed View

Partners

Working in Garissa

The organisations funding and carrying out the published investments here, A–Z.

Funding partners 5

The organisations funding the work.

Implementing partners 5

The organisations carrying out the work on the ground.

Resources

About Garissa

Assessments, plans and reports filed under the county, newest first (its bulletins are above).

No other resource is filed under Garissa yet.

National publications cover every county — the library holds them all.

Open the resource library

Open data

Garissa's record, to download or embed

The same figures as this page, as CSV for a spreadsheet or JSON for software. Free to reuse with credit (CC BY 4.0).

Every dataset
  • Drought early warning phases Garissa's phase month by month, and each livelihood zone's.
  • County bulletin coverage Every month: was a Garissa bulletin published, and did it carry a phase?
  • Drought-resilience investments Every published investment reaching Garissa.
  • Investment GPS sites The GPS sites of those investments.
  • Resource library catalogue Every public resource filed under Garissa, bulletins included.
  • Food security assessments (IPC) Garissa's IPC phase and population in each phase, assessment by assessment.
Put Garissa's drought phase on your website A small, always-current panel — the phase, its trend and the last twelve months — that updates itself as each bulletin is published. <iframe src="https://kms.fabtechcloud.com/embed/early-warning?county=garissa" title="Garissa County drought early warning phase — NDMA" width="360" height="300" style="border:0;max-width:100%" loading="lazy"></iframe>
Preview and options

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please reload the page.